Potensi Pengembangan Kawasan Berorientasi Transit pada Rencana Transportasi Berbasis Rel Lin Lingkar Luar Jakarta
Muhammad Rafif Hasan, Dr. Yori Herwangi, S.T., MURP.
2026 | Skripsi | PERENCANAAN WILAYAH DAN KOTA
Jakarta sebagai pusat perekonomian nasional dan kota global terus
mengalami pertumbuhan pesat dari berbagai aspek, termasuk kependudukan.
Tingginya kepadatan penduduk memicu berbagai permasalahan perkotaan, salah
satunya kemacetan lalu lintas. Permasalahan ini diperparah oleh rendahnya
tingkat penggunaan transportasi publik. Sebagai upaya mengatasinya, pemerintah
mendorong integrasi transportasi publik, termasuk melalui rencana pembangunan
MRT Jakarta Lin Lingkar Luar, serta penerapan konsep pengembangan kawasan
berorientasi transit atau Transit Oriented Development (TOD) untuk
memaksimalkan manfaat integrasi antarmoda. Dalam implementasinya, diperlukan
analisis yang komprehensif, termasuk menilai potensi kawasan agar strategi
pengembangan dapat lebih tepat sasaran. Penelitian ini bertujuan untuk
mengidentifikasi potensi pengembangan kawasan berorientasi transit di sekitar
sembilan rencana stasiun MRT Jakarta Lin Lingkar Luar dalam radius 800 meter.
Metode yang digunakan adalah kerangka 3V yang mencakup tiga dimensi, yaitu node
value, place value, dan market potential value. Hasil
analisis kemudian diselaraskan dengan rencana struktur ruang dalam RTRW DKI
Jakarta 2022–2044. Hasil penelitian menunjukkan bahwa Stasiun Tanjung Barat dan
Stasiun Warung Jati termasuk dalam tipologi immediate dengan potensi
pengembangan TOD yang tinggi. Hal ini menunjukkan bahwa kedua stasiun tersebut
merupakan kawasan yang paling siap untuk dikembangkan sebagai kawasan
berorientasi transit di sepanjang Lin Lingkar Luar MRT Jakarta. Hasil
penelitian ini diharapkan dapat menjadi masukan dan acuan bagi pemangku
kepentingan dalam pengembangan kawasan berorientasi transit pada rencana MRT
Jakarta Lin Lingkar Luar.
Jakarta, as a national economic hub and global city, continues to
experience rapid growth across various aspects, including population. The high
population density has triggered various urban problems, one of which is
traffic congestion. This problem is further compounded by the low rate of
public transportation use. In response, the government is promoting public
transportation integration, including through the planned development of the
MRT Jakarta Outer Ring Line, as well as the implementation of Transit Oriented
Development (TOD) to maximize the benefits of intermodal integration. In its
implementation, a comprehensive analysis is required, including assessing the
potential of each area, so that development strategies can be more precisely
targeted. This study aims to identify the TOD potential around nine planned
stations of the MRT Jakarta Outer Circle Line within an 800-meter radius. The
method used is the 3V framework, which encompasses three dimensions: node
value, place value, and market potential value. The results were then aligned
with the spatial structure plan outlined in the DKI Jakarta Spatial Plan (RTRW)
2022–2044. The findings indicate that Tanjung Barat Station and Warung Jati
Station fall under the immediate typology with high TOD development potential,
suggesting that both stations represent the most ready areas to be developed as
transit oriented districts along the MRT Jakarta Outer Ring Line. The findings
of this study are expected to serve as input and reference for stakeholders in
developing transit-oriented areas along the planned MRT Jakarta Outer Ring
Line.
Kata Kunci : MRT, Jakarta, Transit Oriented Development, Kerangka 3V, Transportasi Umum