Analisis Proses Produksi Menggunakan Pendekatan Lean Manufacturing Studi Kasus pada PT XYZ
Muhammad Adhitya Pradana, Hardo Basuki, Dr., M.Soc.Sc. CSA., CA.,
2026 | Tesis | S2 Ilmu Akuntansi/Akuntansi Terapan
Proses pengolahan rumput laut memiliki variabilitas input dan tahapan yang sensitif terhadap parameter proses serta kondisi lingkungan, sehingga berisiko memicu waiting, penumpukan WIP, cacat mutu, dan aktivitas non–value added. Penelitian ini mendiagnosis aliran produksi current state, memprioritaskan waste dominan beserta keterkaitannya, dan menelusuri akar penyebab waste prioritas untuk menghasilkan arah perbaikan yang dapat ditindaklanjuti. Studi kasus dilakukan melalui integrasi Value Stream Mapping (VSM), Waste Assessment Model (WAM: WRM+WAQ; responden n=11), serta Root Cause Analysis (fishbone dan 5 Why’s) yang didukung observasi, wawancara, dan telaah dokumen. VSM menunjukkan kesenjangan besar antara waktu kerja aktif dan waktu sistem; total waktu proses termasuk tahapan time-based mencapai 4.301 menit dan didominasi pengeringan. Lead time sebesar 12,93 hari mengindikasikan efisiensi siklus proses yang rendah. WAM memprioritaskan Defect, diikuti Process/Overprocessing dan Inventory. RCA mengindikasikan defect dipicu ketidakkonsistenan SOP/kontrol mutu di titik kritis, keterbatasan fasilitas/kapasitas, variabilitas pengeringan berbasis cuaca, dan variasi mutu bahan baku.
Seaweed processing is characterized
by fluctuating input quality and process stages that are sensitive to operating
parameters and environmental conditions, which may increase waiting, WIP
accumulation, quality defects, and non–value-added activities. This
study diagnoses the current state production flow, prioritizes dominant
wastes and their interrelationships, and traces the root causes of priority
waste to derive actionable improvement directions. A case study approach was
employed by integrating Value Stream Mapping (VSM), Waste Assessment
Model (WAM: WRM+WAQ; respondents n = 11), and Root Cause Analysis
(fishbone and 5 Whys), supported by observations, interviews, and document
reviews. The VSM results reveal a large gap between active work time and system
time, total processing time including time-based stages, reaches 4,301
minutes and is dominated by drying. A lead time of 12.93 days indicates low
process cycle efficiency. WAM prioritizes Defects as the dominant waste,
followed by Process/Overprocessing and Inventory. RCA indicates that defects
are driven by inconsistent SOP/quality control at critical points,
facility/capacity constraints, weather-dependent drying variability, and raw
material quality variation.
Kata Kunci : Lean manufacturing, value stream mapping, waste assessment model, waste relationship matrix, waste assessment questionnaire, seaweed processing.