Penerapan Craft Backlog Dalam Penyusunan Weekly Workload Plan Pada Unit Aircraft Maintenance Planning And Control (Studi Kasus di PT. GMF Aero Asia-Jakarta)
Langen Indera Nusanti, Prof. Ir. Jamasri, Ph.D., IPU. ASEAN Eng.
2004 | Skripsi | S1 TEKNIK INDUSTRI