INTEGRASI IMPLEMENTASI BUILDING INFORMATION MODELING (BIM) PADA PROYEK ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC) DI PT HUTAMA KARYA (PERSERO)
Yuni Eka Pratiwi, Rocky Adiguna, SE., M.Sc., Ph.D.,
2025 | Tesis | S2 MANAJEMEN (MM) JAKARTA
Penelitian
ini dilakukan pada tahun 2024 dan berfokus pada evaluasi implementasi Building
Information Modeling (BIM) dalam proyek Engineering, Procurement, and
Construction (EPC) di PT Hutama Karya (Persero). Meskipun BIM telah
diterapkan sejak tahun 2020, implementasinya masih terbatas pada tahapan Engineering
dan belum terintegrasi penuh dengan Procurement dan Construction.
Penelitian ini bertujuan untuk mengidentifikasi kondisi penerapan BIM saat ini,
mengungkap faktor penyebab belum optimalnya integrasi BIM, serta merumuskan
rekomendasi untuk meningkatkan penerapan BIM di semua tahapan proyek EPC. Data
dikumpulkan melalui wawancara mendalam dengan pemangku kepentingan utama proyek
EPC, observasi rutin pada lima proyek yang menerapkan BIM, serta analisis
dokumen terkait. Analisis dilakukan dengan metode process mapping
untuk memetakan alur kerja proyek saat ini dan fishbone diagram untuk
menemukan akar penyebab masalah implementasi. Hasil penelitian menunjukkan
bahwa keterbatasan implementasi BIM disebabkan oleh kurangnya pemahaman manfaat
BIM oleh tim lintas departemen, minimnya kolaborasi antar bagian, serta proses
kerja yang masih bersifat manual. Hambatan ini berpengaruh pada efisiensi dan efektivitas kerja pada proyek.
Rekomendasi yang diajukan meliputi peningkatan kolaborasi antar bagian,
penggunaan platform interface antar bagian, pelatihan umum BIM untuk seluruh
tim proyek, serta standarisasi prosedur yang lebih rinci. Penerapan BIM yang
menyeluruh diharapkan dapat meningkatkan efisiensi, mengurangi risiko
kesalahan, dan memberikan manfaat jangka panjang dalam proyek EPC di PT Hutama
Karya.
This research, conducted in 2024, focuses on evaluating the
implementation of Building Information Modeling (BIM) in Engineering,
Procurement, and Construction (EPC) projects at PT Hutama Karya (Persero).
Although BIM has been implemented since 2020, its application is limited to the
Engineering phase and has not been fully integrated with Procurement and Construction. The study aims to identify the
current state of BIM implementation, identify the factors contributing to its
integration, and propose recommendations to enhance BIM adoption across all EPC
project stages. Data were collected through in-depth interviews with key
project stakeholders, routine observations of five BIM-implemented projects,
and analysis of relevant documents. The analysis employed process mapping
to visualize current project workflows and a fishbone diagram to
identify the root causes of BIM implementation issues. The findings reveal that
the limited implementation of BIM is caused by a lack of understanding of BIM’s
benefits among cross-departmental teams, insufficient collaboration between department,
and reliance on manual processes. These issues have impact on project
efficiency and effectiveness. The proposed recommendations include enhancing collaboration
between department, developing interface platforms for better integration, providing
general BIM training for all project teams, and developing more detailed
standardized procedures. A fully integrated BIM implementation is expected to
improve efficiency, reduce errors, and deliver long-term benefits for EPC
projects at PT Hutama Karya.
Kata Kunci : Building Information Modeling, Adopsi Teknologi, Transformasi Digital, Integrasi BIM, EPC