PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UDANG PEELED DEVEINED DI PT PANCA MITRA MULTIPERDANA DENGAN METODE UA-FLP DAN BLOCPLAN
MUHAMMAD A IZZULHAQ, Dr. R.A. Siti Ari Budhiyanti, S.T.P., M.P.
2024 | Skripsi | TEKNOLOGI HASIL PERIKANAN
PT Panca Mitra Multiperdana
(PT PMMP) merupakan industri yang
berfokus pada ekspor udang beku berjenis peeled deveined, yang mempunyai
permasalahan dalam produktivitas dan efektifitas layout produksinya.
Penelitian dilakukan untuk mengidentifikasi dan mengevaluasi layout PT
Panca Mitra Multiperdana menggunakan metode Unequal Area Facility Layout
Problem (UA-FLP) dan Block Layout Overview with Computerized Planning
Using Logic and Algorithms (BLOCPLAN). Layout awal memiliki panjang
lintasan 157,85 meter dengan OMH sebesar Rp 13.951.808.676,37 per bulan. Perancangan
ulang dengan metode UA-FLP berhasil mengurangi panjang lintasan menjadi 137,45
meter dan OMH menjadi Rp 11.394.448.936,58, yang berarti terdapat pengurangan
sebesar 13% untuk panjang lintasan dan 18% untuk OMH. Sedangkan metode BLOCPLAN lebih efektif
dengan pengurangan panjang lintasan menjadi 130,01 meter dan OMH menjadi Rp
9.449.632.839,11 atau menunjukkan penurunan sebesar 18% untuk panjang lintasan
dan 32% untuk OMH. Hasil penelitian ini menunjukkan bahwa metode BLOCPLAN lebih
unggul dalam mengoptimalkan tata letak fasilitas produksi, mengurangi panjang
lintasan dan OMH secara signifikan, sehingga meningkatkan efisiensi operasional
secara keseluruhan.
PT Panca Mitra Multiperdana (PT PMMP) is an industry
that export frozen shrimp, such as peeled and deveined varieties. The company
faces challenges in productivity and effectiveness of its layout production.
This study aims to identify and evaluate the layout of PT Panca Mitra
Multiperdana using the Unequal Area Facility Layout Problem (UA-FLP) and Block
Layout Overview with Computerized Planning Using Logic and Algorithms
(BLOCPLAN) methods. The existing layout has a material flow length of 157.85
meters and a Material Handling Cost (OMH) of Rp 13,951,808,676.37 per month.
The redesign, using the UA-FLP method, successfully reduced the material flow
length to 137.45 meters and the OMH to Rp 11,394,448,936.58, representing a
reduction of 13% in material flow length and 18% in OMH. While, the BLOCPLAN
method was more effective, it can reducie the material flow length to 130.01
meters and the OMH to Rp 9,449,632,839.11, indicating an 18% reduction in
material flow length and a 32% reduction in OMH. These research that the
BLOCPLAN method is more efficient in optimizing the production facility layout,
significantly reducing material flow length and OMH, thereby improving overall
operational efficiency.
Kata Kunci : BLOCPLAN, OMH, tata letak fasilitas, udang beku, UA-FLP