PT. XYZ adalah salah satu industri pupuk terbesar di Indonesia.

Dikarenakan adanya peningkatan kebutuhan bahan baku yang signifikan ini

sehingga menyebabkan perlunya evaluasi terhadap supply chain internal mulai

dari inbound hingga outbound. Inbound mencakup kegiatan pembongkaran

kedatangan kapal bahan baku hingga proses transfer menuju pabrik, sedangkan

outbound mencakup kegiatan transfer produk jadi ke gudang produk hingga

proses muat produk ke kapal menuju customer. Metode yang digunakan untuk

mengevaluasi kondisi supply chain internal ini adalah simulasi sistem dengan

software Flexsim 2019. Pada penelitian kali ini, hanya satu bahan baku yang akan

dimodelkan, yaitu PR Mesir. Kebutuhan PR Mesir mengalami kenaikan yang

signifikan dimana kenaikan tahun 2023, 2024, dan 2025 terhadap tahun 2022

secara berturut-turut adalah 158%, 196%, dan 241%. Penyebab kenaikan ini

karena terdapat peluncuran produk baru di tahun 2024, yaitu Phosgreen I dan di

tahun 2025, yaitu Phosgreen II.

Analisis performansi menunjukkan bahwa tahun 2023 rencana alokasi

kapasitas bahan baku tidak dapat menampung kebutuhan PR Mesir atau dengan

kata lain terjadi overstock sebesar 28% atau setara dengan 15.513 ton. Sedangkan,

untuk tahun 2024 allowance yang tersisa cenderung kecil, yaitu 5040 ton

sehingga dikhawatirkan terjadinya overstock yang dapat meningkatkan production

cost karena adanya penyewaan gudang eksternal. Dan untuk tahun 2025-2030,

persentase sisa kapasitas gudang bahan baku yang kosong cenderung tinggi, yaitu

22% atau 17.131 ton dengan rata-rata utilitas alokasi gudang bahan baku hanya

sebesar 55%. Hal ini dapat menyebabkan production cost meningkat karena

holding cost/ton bahan baku akan meningkat pula. Maka, perlu dilakukan

perhitungan safety stock dan kebutuhan kapasitas gudang untuk menentukan

alokasi kapasitas gudang yang optimal.

Kata kunci: supply chain internal, simulasi sistem, flexsim, inbound, outbound,

PR Mesir

PT. XYZ is one of the largest fertilizer industries in Indonesia. Due to a

significant increase in the demand for raw materials, there is a need for an

evaluation of the internal supply chain, from inbound to outbound processes.

Inbound activities include unloading of incoming raw material ships and the

transfer process to the factory, while outbound activities involve the transfer of

finished products to product warehouses and the loading of products onto ships

for customers. The method used to evaluate the condition of this internal supply

chain is system simulation using Flexsim 2019 software.

In this study, only one raw material, PR Mesir, will be modeled. The

demand for PR Mesir has shown a significant increase, with consecutive

year-on-year increases of 158% in 2023, 196% in 2024, and 241% in 2025

compared to 2022. This increase is attributed to the launch of new products in

2024, namely Phosgreen I, and in 2025, namely Phosgreen II. Performance

analysis indicates that in 2023, the planned allocation of raw material capacity

cannot meet the demand for PR Mesir, resulting in an overstock of 28%,

equivalent to 15,513 tons. In contrast, for 2024, the remaining allowance is

relatively small, at 5040 tons, raising concerns about potential overstock, which

could increase production costs due to external warehouse rentals. For the years

2025-2030, the percentage of empty raw material warehouse capacity tends to be

high, at 22%, equivalent to 17,131 tons, with an average utilization of raw

material warehouse allocation of only 55%. This situation could lead to increased

production costs as the holding cost per ton of raw material would also rise.

Therefore, it is essential to calculate safety stock and warehouse capacity

requirements to determine the optimal allocation of warehouse capacity.

Keywords: internal supply chain, system simulation, Flexsim, inbound,

outbound, PR Mesir.

Kata Kunci : Kata kunci: supply chain internal, simulasi sistem, flexsim, inbound, outbound, PR Mesir

  1. S1-2023-446612-abstract.pdf  
  2. S1-2023-446612-bibliography.pdf  
  3. S1-2023-446612-tableofcontent.pdf  
  4. S1-2023-446612-title.pdf