EVALUASI PERANCANGAN PRE-FABRICATED VERTICAL DRAIN DI JALAN TOL PEJAGAN-PEMALANG
NAOMI FRANSISKA P, Prof. Dr. Ir. Hary Christady Hardiyatmo, M.Eng., DEA.
2016 | Skripsi | S1 TEKNIK SIPILTanah lunak merupakan tantangan bagi konstruksi Jalan Tol Pejagan-Pemalang. Pre-fabricated Vertical Drain (PVD) yang sering dipilih sebagai metode penanganan tanah lunak pun digunakan di proyek ini. Perancangan PVD pada proyek ini dievaluasi untuk mengetahui capaian kinerja PVD terhadap kondisi yang diharapkan. Data geometri jalan dan sifat-sifat tanah digunakan untuk merancang kebutuhan pita PVD dan kebutuhan timbunan tanah guna memprediksi penurunan tanah dengan metode Terzaghi. Data pemantauan penurunan tanah digunakan untuk memprediksi penurunan akhir tanah dengan metode Asaoka. Hasil prediksi penurunan tanah dibandingkan dengan prediksi penurunan tanah dengan Metode Elemen Hingga (MEH) di dalam dokumen perencanaan. Akurasi prediksi penurunan tanah terhadap kondisi konsolidasi tujuan, yaitu tercapainya 90% konsolidasi dalam 3 bulan, menjadi tolak ukur kinerja PVD. Hasil penelitian menunjukkan bahwa jarak antarpita PVD untuk mempercepat konsolidasi tanah hingga 90% dalam 3 bulan adalah 1,27 meter. Satu dari sembilan titik aplikasi PVD di proyek mencapai derajat konsolidasi 90% dalam 3 bulan sesuai rencana. Tidak tercapainya kondisi konsolidasi tujuan terutama disebabkan oleh perbedaan asli tanah dengan asumsi.
Soft soil was a challenge for Pejagan-Pemalang Highway. Pre-fabricated Vertical Drain (PVD), the most popular soft soil improvement method, also was used in this highway project. PVD design in this project was evaluated in order to know its performance by the desired condition. The highway geometry data and the soil properties was used to design the PVD and the soil embankment in order to predicted the soil settlement with Terzaghi method. Meanwhile, the soil settlement monitoring data was used to predicted the soil settlement with Asaoka method. The result of soil settlement prediction from these two methods were compared with the settlement prediction with Finite Element Method (FEM) in the design. The settlement prediction accuracy compared to the intended consolidation condition, reaching 90% of consolidation in 3 months. This made a scale for PVD performance. The research showed that the needed PVD spacing to reach 90% consolidation in 3 months is 1,27 meters. One of nine PVD applications in this construction project reached consolidation rate of 90% in 3 months, as designed. Some applications did not reach the intended condition because of the difference between the actual with the assumption
Kata Kunci : PVD, konsolidasi, Ch, Tol Pejagan Pemalang