Laporkan Masalah

TINJAUAN KEKUATAN DAN PELAKSANAAN CORBEL PADA PROYEK NEW SKM PT GUDANG GARAM UNIT V KEDIRI

REFA FAIRUZ RAHMAN, Edi Kurniadi, ST., MT.

2015 | Tugas Akhir | D3 TEKNIK SIPIL SV

Dalam pembangunan gedung yang diproyeksikan untuk pabrik, sarana dan prasarana gedung harus ada sebagai penunjang aktifitas pada pabrik itu sendiri. Termasuk akses jalan untuk mempermudah kegiatan karyawan sehari-hari pada pabrik. Pada Proyek New SKM PT. Gudang Garam Tbk Unit V Kediri, terdapat 3 gedung yang akan dibangun diantaranya Gedung Annex, Gedung SKM, dan Gedung Utility. Untuk mempermudah akses jalan karyawan, dibangun jembatan penghubung antar gedung yang bertumpu pada corbel. Terdapat 2 tipe corbel pada proyek tersebut. Pada perencanaan pembangunan, corbel didesain untuk menahan gaya geser Vu, gaya tarik Nuc, dan momen lentur (Vu a + Nuc (h-d)). Dari hasil perhitungan kapasitas corbel, didapat gaya geser (Vu) 975,7 kN, gaya tarik (Nuc) 195,2 kN, dan tahanan momen 497,6 kNm untuk corbel tipe A. Untuk corbel tipe B didapat gaya geser (Vu) 2279,2 kN, gaya tarik (Nuc) 455,84 kN, dan tahanan momen 1162,38 kNm. Dari hasil perhitungan perencanaan corbel, didapat luasan tulangan tarik utama 2241,55 mm2 dan luasan tulangan sengkang tertutup sebesar 950 mm2 untuk corbel tipe A. Untuk corbel tipe B didapat luasan tulangan tarik utama 2549,88 mm2 dan luasan tulangan sengkang tertutup sebesar 950 mm2.

In the construction of the projected for factory, building and infrastructure must exist as supporting activities at the plant itself. Including access roads to facilitate the activities of thedaily employees at the factory. At New SKM PT. Gudang Garam Tbk Unit V Kediri project, there are 3 buildings to be constructed include the buildings Annex , SKM, and Utility building. To facilitate employee access road, built a bridge connecting between the building which rests on the corbel. There are 2 types of the corbel on the project. In development planning, the corbel is designed to hold shear force (Vu), tensile force (Nuc), and bending moment (Vu a + Nuc (h-d)). From the results of the calculation of the capacity of the corbel, obtained shear force (Vu) 975,7 kN, tensile force (Nuc) 195,2 kN, and bending moment 497,6 kNm for the corbel type A. For the corbel type B gained shear force (Vu) 2279,2 kN, tensile force (Nuc) 455,84 kN, and bending moment 1162,38 kNm. From the results of the calculations of the planning corbel, gained area of main tension reinforcement 2241,55 mm2 and area of horizontal reinforcement 950 mm2 for the corbel type A. For the corbel type B, obtained area of main tension reinforcement 2549,88 mm2 and area of horizontal reinforcement 950 mm2.

Kata Kunci : corbel, penulangan, gaya geser, gaya tarik

  1. D3-2015-337068-abstract.pdf  
  2. D3-2015-337068-bibliography.pdf  
  3. D3-2015-337068-tableofcontent.pdf  
  4. D3-2015-337068-title.pdf