Laporkan Masalah

APLIKASI METODE LOGFUSION UNTUK PERHITUNGAN ULANG ORIGINAL GAS IN PLACE RESERVOAR BATUPASIR R-2 DAN R-5 FORMASI BINIO, LAPANGAN LANCANG KUNING, CEKUNGAN SUMATERA TENGAH

OCTA FIANDANI PUTRA, Sarju Winardi, S.T., M.T.

2015 | Skripsi | S1 TEKNIK GEOLOGI

Lapangan Lancang Kuning merupakan lapangan produksi gas biogenik yang dioperasikan oleh PT.EMP Bentu Ltd. Kandungan fluida gas di dalam reservoar menyebabkan penerapan analisis petrofisik secara konvensional memberikan hasil yang tidak cocok dengan hasil pengukuran batu inti. Hal ini berdampak pada hasil perhitungan Original Gas In Place (OGIP) yang memberikan hasil jauh berbeda terhadap perhitungan OGIP dari data produksi gas beberapa tahun setelah berproduksi. Analisis petrofisik metode LOGFUSION diterapkan untuk perhitungan ulang OGIP reservoar batupasir R-2 dan R-5, Formasi Binio, Lapangan Lancang Kuning, Cekungan Sumatra Tengah. Analisis menggunakan data 1 batu inti, 5 log sumur, dan data sekunder terkait reservoar R-2 dan R-5. Penelitian meliputi karakterisasi reservoar, perhitungan volume serpih, porositas efektif, saturasi air, penentuan cut-off net pay, ketebalan zona net pay, simulasi Monte-carlo untuk perhitungan OGIP serta perbandingan dengan hasil perhitungan OGIP metode flowing material balance. Hasil karakterisasi menunjukkan litologi reservoar relatif tipis (5-30 ft) dan bersifat laminated shaly sand dengan tingkat konsolidasi lemah. Hasil penentuan cut-off properti reservoar berupa volume serpih sebesar 0,52-0,60, porositas efektif sebesar 0,14-0,15, dan saturasi air sebesar 0,99 memberikan hasil rerata untuk masing-masing zona reservoar, yakni : reservoar R-2 dengan porositas efektif sebesar 0,27, saturasi air sebesar 0,37, dan tebal net pay 24,58 ft ; reservoar R-5 dengan porositas efektif sebesar 0,31, saturasi air sebesar 0,34, dan tebal net pay 11,57 ft. Simulasi Monte-Carlo untuk perhitungan OGIP memberikan hasil untuk masing-masing reservoar, yakni : reservoar R-2 dengan P(90) sebesar 43,649 Bscf, P(50) sebesar 70,230 Bscf, dan P(10) sebesar 107,733 Bscf ; reservoar R-5 dengan P(90) sebesar 79,086 Bscf, P(50) sebesar 155,428 Bscf, dan P(10) sebesar 301,634 Bscf. Hasil perbandingan nilai OGIP menunjukkan bahwa penggunaan nilai P(90) dari perhitungan OGIP hasil simulasi Monte-Carlo menunjukkan hasil yang paling realistis terhadap data produksi.

Lancang Kuning field is a biogenic gas production field operated by EMP Bentu Ltd. Gas fluids inside reservoirs causing conventional petrophysical analysis application shows unmatched results to core measurements data. This is implied to significant differences between volumetric Original Gas In Place (OGIP) calculation in exploration phase with OGIP calculation from production data after years of production. Application of LOGFUSION petrophysical analysis method for OGIP calculation has been conducted for R-2 and R-5 Binio Formation sandstone reservoirs in Lancang Kuning field, Central Sumatera Basin. One core, five well logs, and several secondary data regarding these reservoirs were used to conduct the research. The research includings reservoir characterization, shale volume, effective porosity, water saturation calculation, net pay properties cut-off and thickness determination, Monte-Carlo simulation for OGIP calculation and also comparation with flowing material balance result. The reservoir lithologies characterized by relatively thin (5-30 ft) laminated shaly sand with poorly consolidated sandstones. Reservoirs correlation result shows good continuity and relatively uniform thickness of these reservoirs. Cut-off property has been determined with 0,52-0,60 shale volume, 0,14-0,15 effective porosity, and 0,99 water saturation giving average value results for both reservoirs : R-2 reservoir with 0,27 effective porosity, 0,37 water saturation, and 24,58 ft net pay thickness ; R-5 reservoir with 0,31 effective porosity, 0,34 water saturation, and 11,57 ft net pay thickness. Monte-Carlo simulation for OGIP calculation has been conducted and giving results for both reservoirs : R-2 reservoir with 43,649 Bscf P(90), 70,230 Bscf P(50), and 107,733 Bscf P(10) values ; R-5 reservoir with 79,086 Bscf P(90), 155,428 Bscf P(50), and 301,634 Bscf P(10) values. OGIP comparation shows that P(90) value of OGIP calculation from Monte-Carlo simulation gives the most realistic result to production data.

Kata Kunci : Reservoir, Porosity, LOGFUSION, OGIP, Monte-Carlo Simulation

  1. S1-2015-301271-abstract.pdf  
  2. S1-2015-301271-bibliography.pdf  
  3. S1-2015-301271-tableofcontent.pdf  
  4. S1-2015-301271-title.pdf