PERANCANGAN ULANG SKIDWAY PT.McDERMOTT INDONESIA BATU AMPAR, BATAM
LORENTZ AGATHA MELIALA, Dr. Ir. Ahmad Rifa’i, MT.
2014 | Skripsi | TEKNIK SIPILSkidway milik PT.McDermott Indonesia yang berlokasi di Batu Ampar, Batam berupa bangunan pelat disangga tiang pancang atau bor. Skidway berfungsi sebagai alas fabrikasi struktur-struktur berbobot berat seperti tower, platform oil rig, jacket. Kapasitas skidway saat ini adalah 24.000 ton. Menghadapi perkembangan dunia oil & gas kapasitas skidway perlu ditingkatkan. Tugas akhir ini dilakukan untuk mendapatkan desain baru skidway dengan beban total 30.000 ton dan beban titik 5000 ton. Skidway terbagi menjadi 2 Area, beban rencana area 2 lebih besar 30% dari Area 1 akibat proses load out. Proses perancangan skidway dimulai dengan mendapatkan beban rencana sebagai dasar perencanaan. Pengolahan data N-SPT hasil penyelidikan lokasi dilakukan untuk mendapatkan kuat dukung tiang pancang, tiang bor dan modulus elastisitas tanah. Perbandingan antara kuat dukung fondasi dan beban akan memberikan ukuran satu panel pelat yang digunakan sebagai jarak antara tiang pancang dan tiang bor pada pelat. Perancangan pelat mengacu pada ketentuan SNI 03-2847-2002. Tahapan perencanaan awal dilakukan untuk menentukan perkiraan dimensi struktur pelat yang kemudian digunakan sebagai input dalam program SAP2000. Output dari SAP2000 berupa gaya-gaya dalam kemudian diproses secara manual untuk proses perancangan akhir untuk mendapatkan jumlah dan jarak tulangan. Dari hasil proses pemodelan didapat momen maksimum 1749 kNm & - 822,2 kNm (Area 1) dan 2968,4 kNm & -1753,4 kNm (Area 2). Hasil perancangan digunakan ukuran tiang pancang sebesar 0,5×0,5 m (square pile) dengan jarak antara tiang 1 m dan terpancang pada kedalaman 7,5 m (Area 1). Sementara tiang bor berukuran diameter 1 m dengan jarak antara tiang 1,5 m yang diletakkan hingga kedalaman 8 m (Area 2). Desain penulangan untuk pelat dengan tebal 1 m yang didapat dari hasil analisis adalah: Ø = 25mm; s = 75 mm (momen positif) & Ø = 25mm; s = 150 mm (momen negatif). Untuk pelat dengan tebal 1,3 m digunakan: Ø = 32mm; s = 90 mm (momen positif) & Ø = 32mm; s = 150 mm (momen negatif).
Skidway owned by PT.McDermott Indonesia is located in Batu Ampar, Batam is a plate supported on piles or bore pile. Skidway main fuction is as a board fabrication for heavy weight structures such as tower, oil rig platform, and jacket. Skidway current capacity is 24.000 tons. Facing the development of oil and gas, skidway capacity needs to be improved. This final project was conducted to get the new design for skidway with a total bearing load of 30.000 tons and a point load of 5.000 tons. Skidway is divided into 2 areas where design load for Area 2 is increased by 30% due to load out process. Skidway design process starts by obtaining design load as a basis data for planning. N-SPT data from soil investigation was analyzed to obtain pile, bore pile bearing capacity and soil modulus of elasticity. Comparison between pile bearing capacity and design load will give the size of single panel plate which is used as distance between each pile. Plate design process is based on the provision of SNI 03-2847-2002. An initial design stept is done in order to determine the approximate dimension of the structures as an input in the program SAP2000. SAP2000 output such as moment, shear load was manually processed to obtain the design for reinforcing steel size and spacing. The result of the modelling process give maximum moment of 1749 kNm & -822,2 kNm (Area 1) and 2968,4 kNm & -1753,4 kNm (Area 2). The design result is 0,5×0,5 m pile with 1 m distance between each pile and jacked to -7,5 m below ground level (Area 1). Bore pile with diameter of 1 m is used with distance between each bore pile is 1,5 m and bored to -8 m below the ground level (Area 2). The design of reinforcing steel for 1 m thick plate is Ø = 25mm; s = 75 mm (positive moment) & Ø = 25mm; s = 150 mm (negative moment). Plate with 1,3 m thickness in Area 2 use Ø = 32mm; s = 90 mm (positive moment) & Ø = 32mm; s = 150 mm (negative moment).
Kata Kunci : Skidway, tiang pancang, pelat, perancanaan tulangan