OPTIMALISASI RAWA MAYO SEBAGAI SUMBER AIR DI KAWASAN KUMBE - KURIK DENGAN SISTEM POMPANISASI DI KABUPATEN MERAUKE

Dominikus Catus B, ST., Prof. Dr. Ir. Fatchan Nurrochmad, M.Agr.,

2012 | Tesis | S2 Mag.Pengl.Sumberdaya Air

Rawa Mayo selama ini dimanfaatkan untuk kebutuhan irigasi lahan pertanian Kampung Kurik II (Harapan Makmur), Kampung Kurik (Wonorejo) dan Kampung Kurik I (Rawasari). Pemanfaatan sumber air Rawa Mayo diharapkan dapat mencukupi kebutuhan air irigasi terhadap potensi luas lahan. Penelitian perlu dilakukan terlebih dahulu agar air yang tertampung di Rawa Mayo dapat dimanfaatkan secara maksimal untuk suplai air irigasi lahan yang tersedia seluas 2.038Ha. Dalam penelitian ini dilakukan beberapa pergeseran jadwal tanam maupun pola tanam guna memaksimalkan potensi lahan dan air rawa yang ada. Ketiga Alternatif disimulasikan berdasarkan jadwal tanam bulan Januari, November dan Desember dengan pola tanam Padi-Padi-Palawija. Penetapan Alternatif yang terbaik ditentukan menggunakan metode Analytical Hierarchy Process (AHP) dengan mempertimbangkan faktor kecukupan yang diwakili oleh indikator Relative Irrigation Supply (RIS), sedangkan efisiensi dan efektivitas diwakili oleh efisiensi sistem (Esistem) dan intensitas tanam (IT). Berdasarkan Analytical Hierarchy Process (AHP) ketiga Alternatif dilakukan dengan mempertimbangkan jadwal tanam yang mengacu pada faktor luas lahan, efisiensi air dan intensitas tanam. Jadwal tanam yang paling ideal adalah pada bulan November. Pada Alternatif pertama luas tanam pada MT-I, MT-II dan MT-III adalah 236 Hektar, sedangkan pada Alternatif kedua dan ketiga luas tanam MT-III (Palawija) adalah 50 Hektar dan 75 Hektar. Mengacu pada Alternatif kedua dan Alternatif ketiga maka MT-I dan MT-II luas tanamnya 316 Hektar dan 306 Hektar. Pompa yang digunakan untuk mengairi luas lahan persawahan masyarakat petani terdiri dari 2 unit mesin pompa dengan kapasitas 0,75 m3/dtk, dengan lama pengoperasian optimal rata-rata 7 jam/hari.

Mayo Swamp so far is used for irrigating the agriculture area of Kampung Kurik II (Harapan Makmur), Kampung Kurik (Wonorejo) and Kampung Kurik I (Rawasari). The benefit of Mayo Swamp water source is hoped to answer the demand of water irrigation towards the potency of area’s width. Research is needed to be conducted first in order to get the maximal benefit of the accommodated water in Mayo Swamp for irrigation water supply area which of width is 2038Ha. In this research, some shifted schedule and planting pattern is done in order to maximize the area potency and the available swamp water. The three alternative which simulated based on the planting schedule include Alternative I which is started in January, while Alternative II and Alternative III are started in November and December with the planting pattern Rice plant-Rice plant-Seasonal Plants. The best decided alternative is determined by using the method Analytical Hierarchy Process (AHP) by considering the sufficiency factor which is represented by the indicator of Relative Irrigation Supply (RIS), while efficiency and effectiveness are represented by the efficiency system (Esistem) and planting intensity (IT). The priority determination (the best alternative) is done by choosing the biggest weight from the three planned alternatives. Based on the method Analytical Hierarchy Process (AHP), the three alternative are conducted by considering the planting schedule which refers to the factor of area’s width, water efficiency, and planting intensity. The most ideal planting schedule based on AHP has to be conducted in November. In the planting width of the first alternative on MT-I, MT-II and MT III is 236 Ha, while on the second and third alternative of planting width on MT-III (seasonal plants) are 50 Ha and 75 Ha. Referring to the second and third alternative then the planting width of MT-I and MT-II are 316 Ha and 306 Ha. The pump which is used to irrigate the farmers’ rice fields includes 2 units of pump machines with the capacity 0.75 m3/sec with the duration of optimal operation approximately 7 hours/day.

Kata Kunci : Ketersedian air, kebutuhan air irigasi, neraca air, optimalisasi, AHP.


    Tidak tersedia file untuk ditampilkan ke publik.