Laporkan Masalah

UJI PERFORMANCE TURBIN CROSS FLOW Ø200 SEBAGAI SISTEM PEMBANGKIT LISTRIK TENAGA MIKROHIDRO

Vickie Igor Romualdez Tampubolon, Dr.Sc.Tech. Adhy Kurniawan, S.T.

2011 | Tesis | S2 Mag.Sistem Teknik

Menurut data DJLPE tahun 2008, potensi sumber energi mikrohidro di Indonesia sebesar 458,75 MW, sedangkan kapasitas yang baru terpasang sebesar 20,9 MW. Magister Sistem Teknik UGM Yogyakarta dengan konsentrasi Mikrohidro (Renewable Energy) merupakan lembaga pendidikan di Indonesia yang konsen terhadap pengembangan Energi Baru dan Terbarukan (EBT). Kegiatan magang mahasiswa konsentrasi Mikrohidro MST UGM angkatan 2008 yang dilakukan di Laboratorium Diploma Teknik Mesin menghasilkan sebuah Turbin Cross Flow. Penelitian ini bertujuan untuk menguji karakteristik Turbin Cross Flow hasil magang mahasiswa Mikrohidro MST UGM angkatan 2008 sebagai sistem pembangkit listrik tenaga mikrohidro, yang dilakukan di Laboratorium dan di Lapangan yaitu di Dusun Bayeman, Turi, Sleman, Yogyakarta. Hasil pengujian Turbin Cross Flow di laboratorium menunjukkan bahwa debit air maksimum 0,0652 m3/s, head efektif 0,7 m, putaran turbin 334 rpm, torsi turbin 0,22 Nm, daya mekanik turbin 7,84 watt, dan efisiensi turbin maksimal 18,89%. Hasil pengujian di PLTMH Dusun Bayeman, Turi, Sleman, Yogyakarta yang dilakukan tanpa menghubungkan dengan beban, menunjukkan bahwa head efektif 6,15 m, debit air 0,045 m3/s, putaran turbin 450 rpm, torsi turbin 7,924 Nm, daya mekanik turbin 373,208 watt, daya potensial air 2.714,92 watt, dan efisiensi turbin 13,75%. Sedangkan hasil pengujian Turbin di lapangan yang dihubungkan dengan motor induksi 1 HP, 3φ dengan beban lampu 50 watt, menghasilkan daya output maksimal motor induksi 172,8 watt, putaran turbin 203 rpm, putaran motor induksi 800 rpm, dan efisiensi total 6,36%. Hasil analisis ekonomi menyimpulkan bahwa pembangun proyek PLTMH Dusun Bayeman tidak layak menggunakan Turbin Cross Flow dengan motor induksi 1 HP, 3φ yang digunakan untuk pengujian pada penelitian ini, sedangkan dengan daya potensial yang tersedia di Dusun Bayeman layak untuk dilakukan pembangunan proyek renovasi PLTMH Dusun Bayeman dengan perhitungan Break Event Point (BEP) selama 4 tahun 6 bulan setelah proyek renovasi selesai dilakukan.

According to data from DJLPE in 2008, potential micro-hydro energy sources in Indonesia for 458.75 MW, while the newly installed capacity of 20.9 MW. Masters in Systems Engineering with a concentration of micro hydro UGM (Renewable Energy) is an educational institution in Indonesia that concern about the development of New and Renewable Energy (EBT). Activities of student interns concentration of micro hydro generation MST UGM 2008 conducted at the Laboratory of Mechanical Engineering Diploma generate a Cross Flow Turbine. This research aims to examine the characteristics of Cross Flow Turbine by microhydro MST UGM students of 2008 interns results as a system of microhydro power plant, conducted in the laboratory and in the Field is in the Dusun Bayeman, Turi, Sleman, Yogyakarta. Cross Flow Turbine test results in the laboratory showed that the maximum water discharge 0.0652 m 3 /s, effective head 0.7 m, turbine rotation 334 rpm, turbine torque of 0.22 Nm, turbine mechanical power 7.84 watts, and maximum turbine efficiency 18.89%. Test results on the MHPP Dusun Bayeman, Turi, Sleman, Yogyakarta is done without connecting the load, shows that the effective head 6.15 m, water discharge 0.045 m 3 /s, turbine rotation 450 rpm, turbine torque 7.924 Nm, mechanical power turbines 373.208 watts, water potential power 2714.92 watts, and turbine efficiency 13.75%. While the results of testing of turbines in the field associated with the induction motor 1 HP, 3φ with 50 watt lamp load, produces a maximum induction motor output power 172.8 watts, turbine rotation 203 rpm, induction motor rotation 800 rpm, and total efficiency 6.36%. The results of economic analysis concluded that the project builder MHPP Dusun Bayeman not feasible using Cross Flow Turbine with 1 HP induction motor, 3φ used for testing in this research, while the power potential available in the Dusun Bayeman feasible renovation project development MHP Bayeman Dusun with the calculation Break Event Point (BEP) for 4 years and 6 months after completion of the renovation project.

Kata Kunci : Turbin Cross Flow, Debit, Head Efektif, Putaran Turbin, Torsi, Daya Mekanik Turbin, Efisiensi Turbin.


    Tidak tersedia file untuk ditampilkan ke publik.