Laporkan Masalah

ANALISIS KELAYAKAN INVESTASI PEMBANGUNAN PEMBANGKIT LISTRIKTENAGA UAP(PLTU) kAPASITAS 2X25 MW DI WILAYAH BATUAH-KALIMANTAN TIMUR

Helmy Budiman, ST., Tandelilin Eduardus, Prof. Dr., M.B.A.

2012 | Tesis | S2 Magister Manajemen

Penelitian ini merupakan studi kelayakan proyek; yang bertujuan untuk menganalisis kelayakan secara finansial pembangunan Pembangkit Tenaga Listrik (PLTU) Kapasitas 2×25 MW di Wilayah Batuah-KalimatanTimur. Indikator yang digunakan untuk menganalisis kelayakan Pembangkit Tenaga Listrik (PLTU) Kapasitas 2×25 MW di Wilayah Batuah - Kalimatan Timur tersebut adalah : payback periode, net present value (NPV), internal rate of return (IRR), profitability index (PI); dan selanjutnya dilakukan analisis sensitivitas dengan variabel biaya modal rata rata tertimbang (WACC), penjualan, biaya operasional variabel, dan biaya operasional tetap.Hasil penelitian ini menunjukkan : (1) payback period (PP) selama 7.2 tahun, layak, karena lebih singkat dari umur proyek (30 tahun); (2) net present value (NPV) sebesar $20,722,997.65, layak, karena lebih besar dari nol (positif), (3) internal rate of return (IRR) sebesar 11.04 tahun, layak, karena lebih besardari WACC (7.82%), dan profitability index (PI) sebesar 1.24 kali, layak, karena lebih besardari 1 kali. Hasil analisis sensitivitas menunjukkan bahwa, NPV proyek sangat sensitif terhadap perubahan penjualan dan perubahan biaya operasi tetap.

This research is a project feasibility study; which aims to analyze the financial feasibility of the construction of Power Plants (PLTU) Capacity 2 x 25 MW in the region of Batuah-East Kalimantan. The indicator used to analyze the feasibility of Power Plants (PLTU) Capacity 2 x 25 MW in the region of Batuah-East Kalimantan are: payback period, net present value (NPV), internal rate of return (IRR), profitability index (PI); and then performed a sensitivity analysis with variable capital cost weighted average (WACC), sales, operating costs variable and fixed operating costs. The results of this study indicate: (1) payback period (PP) during 7.2 years, feasible, because it is shorter than the project life (30 years), (2) net present value (NPV) of $ 20,722,997.65, feasible, because it is greater than zero ( positive), (3) internal rate of return (IRR) equal to 11:04 years, feasible, because it is greater than WACC (7.82%), and profitability index (PI) 1.24 times, feasible, since more than 1 times. The sensitivity analysis shows that, the project NPV is very sensitive to changes in sales and changes in fixed operating costs.

Kata Kunci : payback periode, net present value, internal rate of return, profitability index, analisissensitivitas, WACC.


    Tidak tersedia file untuk ditampilkan ke publik.