Laporkan Masalah

Implementasi PDCA Cycle pada Pengendalian Mutu dan Metode Pelaksanaan Pekerjaan Bored Pile (P155N) Proyek Pembangunan Jalan Tol Ancol Timur-Pluit (Elevated) Harbour Road II

Muhammad Choirun Na'im, Ir. Edi Kurniadi, S.T., M.T.

2026 | Tugas Akhir | D4 TEKNOLOGI REKAYASA PELAKSANAAN BANGUNAN SIPIL

Proyek pembangunan Jalan Tol Ancol Timur-Pluit atau bisa disebut Harbour Road II menyimpan tantangan tersendiri pada pekerjaan struktur bawah, terutama fondasi bored pile yang berisiko mengalami cacat konstruksi sebagai akibat dari tahapan pelaksanaan yang panjang dan rumit. Sehingga pengendalian mutu yang tepat perlu diterapkan agar potensi permasalahan dapat ditekan, salah satu metode populer yaitu PDCA (Plan-Do-Check-Act). Oleh karena itu, penelitian ini disusun untuk mengkaji metode pelaksanaan pekerjaan fondasi bored pile pada titik P155N, menilai kesesuaian antara spesifikasi perencanaan dengan kondisi pelaksanaan sesungguhnya di lapangan, serta mengidentifikasi berbagai kendala yang teridentifikasi melalui siklus PDCA. Pengumpulan data dilakukan melalui pengamatan langsung di lapangan, wawancara narasumber, dan penelaahan dokumen teknis proyek selama kurun waktu empat bulan, yang selanjutnya diolah dengan pendekatan PDCA. Permasalahan yang terjadi akan dianalisa sehingga menghasilkan solusi yang dapat diterapkan di lapangan dengan memerhatikan faktor biaya, mutu, dan waktu. Temuan penelitian memperlihatkan bahwa rangkaian tahapan persiapan, pengeboran, penulangan, pengecoran, hingga pengujian tiang pada titik P155N pada dasarnya telah mengikuti standar teknis metode dan pengendalian mutu yang ditetapkan proyek. Berdasarkan analisis 5M+1E (Man, Material, Machine, Method, Measurement, Environment), faktor Measurement, Material, dan Man teridentifikasi sebagai penyumbang terbesar terhadap kendala mutu, dengan total persentase kumulatif mencapai 52,36%. Adapun solusi yang diprioritaskan untuk diterapkan antara lain: 1) Penugasan mekanik di lokasi pekerjaan; 2) Pemusatan jadwal kerja pada satu zona; dan 3) Pengendalian torsi alat bor ketika menghadapi kondisi tanah lunak. Dari hasil tersebut, dapat disimpulkan bahwa siklus PDCA dalam penelitian ini baru mencapai tahap perumusan solusi, sehingga masih diperlukan penelitian lanjutan guna menguji tingkat efektivitasnya pada iterasi berikutnya.

The construction project of the Ancol Timur-Pluit Toll Road, also known as Harbour Road II, presents its own challenges in the substructure works, particularly the bored pile foundation, which is at risk of construction defects resulting from a lengthy and complex execution process. Proper quality control therefore needs to be implemented to minimize potential problems, and one widely used method is PDCA (Plan-Do-Check-Act). This study was therefore conducted to examine the construction method of the bored pile foundation at point P155N, assess the conformity between the design specifications and actual field conditions, and identify the various obstacles found through the PDCA cycle. Data were collected through direct field observation, interviews with informants, and review of the project's technical documents over a four-month period, which were subsequently processed using the PDCA approach. The problems encountered were analysed to produce solutions applicable in the field, considering cost, quality, and time factors. The research findings show that the sequence of stages — preparation, drilling, reinforcement installation, concreting, and pile testing — at point P155N essentially followed the technical method standards and quality control procedures established by the project. Based on the 5M+1E analysis (Man, Material, Machine, Method, Measurement, Environment), Measurement, Material, and Man were identified as the largest contributors to quality-related obstacles, with a cumulative percentage of 52.36%. The prioritized solutions for implementation include: 1) assigning mechanics to the work site; 2) concentrating the work schedule within a single zone; and 3) controlling drilling torque under soft soil conditions. Based on these findings, it can be concluded that the PDCA cycle in this study has only reached the solution-formulation stage, so further research is still needed to test its effectiveness in the next iteration.

Kata Kunci : Pengendalian Mutu, PDCA, Metode Pelaksanaan, Bored Pile

  1. D4-2026-505790-abstract.pdf  
  2. D4-2026-505790-bibliography.pdf  
  3. D4-2026-505790-tableofcontent.pdf  
  4. D4-2026-505790-title.pdf