Evaluasi Pengendalian Mutu Beton Bored Pile Berdasarkan Metode Pelaksanaan dan Hasil Pengujian pada Proyek New Priok Eastern Access Seksi II

Ayu Afdha Fadia, Ir. Nursyamsu Hidayat S.T., M.T.,Ph.D.

2026 | Tugas Akhir | D4 TEKNOLOGI REKAYASA PELAKSANAAN BANGUNAN SIPIL


Pekerjaan pondasi bored pile menggunakan casing merupakan tahap kritis proyek infrastruktur New Priok Eastern Access Seksi II. Tanah lunak dan tingginya muka air memicu risiko penurunan mutu beton, seperti segregasi dan cold joint. Penelitian ini bertujuan mengevaluasi pengendalian mutu beton self compacting concrete berdasarkan metode pelaksanaan dan pengujian. Evaluasi mencakup kemampuan aliran beton, pencapaian target kuat tekan f'c 40 MPa, integritas penampang, serta daya dukung.

Penelitian difokuskan pada titik abutment 2 BP1 dan BP3. Data dikumpulkan dari pengujian lapangan dan laboratorium, lalu dievaluasi dengan membandingkan realisasi pekerjaan terhadap spesifikasi teknis. Adapun pengujian yang dianalisis meliputi uji slump flow beton segar dan uji kuat tekan silinder pada umur 7, 10, 14, serta 28 hari. Dilakukan juga pengujian non destructive test berupa crosshole sonic logging untuk mendeteksi keutuhan tiang dan pile driving analyzer guna memvalidasi kapasitas daya dukung pondasi.

Hasil penelitian menunjukkan proses pengendalian mutu beton berjalan optimal dan sesuai spesifikasi. Uji slump flow menghasilkan sebaran 615,36 mm dan 616,81 mm dengan waktu 4 hingga 6 detik. Kuat tekan beton pada umur 28 hari mencapai 42,11 hingga 43,07 MPa, yaitu 105 hingga 107 persen dari target. Pengujian crosshole sonic logging membuktikan struktur tiang homogen berstatus Class A, dan divalidasi oleh pile driving analyzer dengan integritas 100 persen. Kapasitas daya dukung ultimate tercatat 1.938,6 ton, melampaui desain teoritis 1.411,4 ton, dengan penurunan 10,80 mm. Disimpulkan bahwa mutu pondasi bored pile ini sangat solid, aman, dan memenuhi spesifikasi proyek.


Bored pile foundation work using casing is a critical stage in the New Priok Eastern Access Section II infrastructure project. Soft soil and high water levels trigger the risk of concrete quality degradation, such as segregation and cold joints. This study aims to evaluate the quality control of Self-Compacting Concrete based on execution and testing methods. The evaluation includes concrete flowability, achievement of the target compressive strength of f'c 40 MPa, cross-sectional integrity, and bearing capacity.


The research is focused on Abutment 2 points BP1 and BP3. Data was collected from field and laboratory tests, then evaluated by comparing the actual work realization against technical specifications. The analyzed tests include the slump flow test for fresh concrete and cylinder compressive strength tests at 7, 10, 14, and 28 days. Non-Destructive Tests in the form of crosshole sonic logging to detect pile integrity and pile driving analyzer to validate the foundation's bearing capacity were also conducted.


The research results indicate that the concrete quality control process ran optimally and in accordance with the specifications. The slump flow test produced spreads of 615.36 mm and 616.81 mm with a time of 4 to 6 seconds. The concrete compressive strength at 28 days reached 42.11 to 43.07 MPa, which is 105 to 107 percent of the target. The crosshole sonic logging test proved that the pile structure is homogeneous with a Class A status, and was validated by the pile driving analyzer with 100 percent integrity. The ultimate bearing capacity was recorded at 1,938.6 tons, surpassing the theoretical design of 1,411.4 tons, with a settlement of 10.80 mm. It is concluded that the quality of this bored pile foundation is highly solid, safe, and complies with project specifications.

Kata Kunci : Bored Pile, Pengendalian Mutu, Slump Flow Test, Self Compacting Concrete, Crosshole Sonic Logging, Pile Driving Analyzer.