Evaluasi Kinerja Sistem Instalasi Pengolahan Lindi (IPL) Zona Transisi 1 dan 2 pada TPA Piyungan, Kecamatan Piyungan, Kabupaten Bantul
Muhammad Daffa Aradhana, Ir. Ni Nyoman Nepi Marleni, S.T., M.Sc., Ph.D., IPM., ASEAN Eng.
2026 | Skripsi | S1 TEKNIK INFRASTRUKTUR LINGKUNGAN
Instalasi
Pengolahan Lindi (IPL) Zona Transisi TPA Piyungan mengolah lindi dari Zona
Transisi 1 dan 2 melalui bak ekualisasi, koagulasi-flokulasi, sedimentasi,
oksidasi kimiawi, bak anaerobik, filtrasi karbon aktif, dan bak maturasi,
mengombinasikan mekanisme fisik, kimia, dan biologis. Pemantauan oleh DLHK DIY
pada 2025 menunjukkan efluen beberapa parameter melebihi baku mutu. Penelitian
ini bertujuan menganalisis karakteristik lindi, beban pencemar, dan penyebab
ketidakoptimalan, mengevaluasi efisiensi dan kesesuaian parameter unit terhadap
kriteria desain, serta menyusun rekomendasi perbaikan.
Penelitian
dilakukan di IPL Zona Transisi TPA Piyungan, DIY, dengan pengambilan sampel
lindi di tiga inlet, setiap unit pengolahan, dan outlet, serta pengukuran debit
volumetrik pada inlet, outlet, dan gate valve bak ekualisasi,
dilaksanakan pada April–Mei 2026 selama tiga periode pengamatan. Parameter pH,
COD, dan TSS diukur pada seluruh unit sesuai relevansi pengolahannya, warna
hanya pada inlet, dan Escherichia coli hanya pada bak maturasi. Evaluasi
meliputi analisis karakteristik lindi dan beban pencemar, perhitungan efisiensi
kinerja tiap unit dan IPL secara keseluruhan, kesesuaian parameter operasional
unit terhadap kriteria desain, observasi operasional-pemeliharaan, serta jar
test menggunakan polyaluminium chloride dan NaOCl.
Hasil
menunjukkan karakteristik lindi Inlet 1 berupa muda menuju transisi, Inlet 2
berupa lindi stabil, dan Inlet 3 berupa rembesan tanggul Zona Transisi 1,
dengan debit total 32,33–65,90 m³/hari. Seluruh unit tidak memenuhi kriteria
desain, seperti waktu detensi bak ekualisasi jauh melebihi kriteria, gradien
kecepatan dan konfigurasi mixer 1 tidak sesuai kriteria, overflow
rate rendah dan short-circuiting pada bak sedimentasi, hingga SDB gagal
berfungsi akibat media dan drainase tidak sesuai standar. Beban masuk berkisar
318,73–361,58 kg COD/hari dan 19,93–52,50 kg TSS/hari. Efisiensi keseluruhan
IPL untuk COD sebesar 7%, ?3%, dan ?4%, serta TSS sebesar 22%, ?21%, dan 10%,
sehingga efluen belum memenuhi baku mutu Permen LHK No. 59/2016. Dari aspek
operasional ditemukan masalah pada dosis koagulan, saluran bypass terbuka,
media filtrasi, pH operasi, dan SOP belum tersedia. Rekomendasi meliputi
optimalisasi operasi, rehabilitasi-modifikasi unit, dan penyusunan SOP. Sebagai
bagian dari rekomendasi, dilakukan jar test dengan dosis optimum PAC
1.800 mg/L dan NaOCl 50 mg/L menghasilkan efisiensi COD 76%.
The
Leachate Treatment Plant (LTP) in the Transition Zone of TPA Piyungan (Piyungan
Landfill) treats leachate from Transition Zones 1 and 2 through an equalization
basin, coagulation–flocculation, sedimentation, chemical oxidation, an
anaerobic basin, activated carbon filtration, and a maturation basin, combining
physical, chemical, and biological mechanisms. Monitoring by the DIY
Environmental and Forestry Agency (DLHK DIY) in 2025 showed that several
effluent parameters exceeded the applicable quality standards. This study aims
to analyze the leachate characteristics, pollutant loads, and causes of
suboptimal performance, evaluate treatment efficiency and the conformity of
unit parameters with design criteria, and formulate improvement
recommendations.
The
research was conducted at the LTP in the Transition Zone of TPA Piyungan, DIY,
with leachate sampling at three inlets, each treatment unit, and the outlet,
and volumetric flow measurement at the inlets, outlet, and the equalization
basin gate valve, conducted in April–May 2026 over three observation periods.
pH, COD, and TSS were measured at all units according to their treatment
relevance, color only at the inlets, and Escherichia coli only at the
maturation basin. The evaluation included analysis of leachate characteristics
and pollutant loads, calculation of efficiency for each unit and for the LTP as
a whole, conformity of unit operational parameters with design criteria,
observation of operational-maintenance conditions, and jar testing using
polyaluminium chloride and NaOCl.
Results
show that Inlet 1 leachate is young transitioning toward intermediate, Inlet 2
is stabilized leachate, and Inlet 3 is seepage from the Transition Zone 1
embankment, with a total flow rate of 32.33–65.90 m³/day. None of the units met
the design criteria: the equalization basin's detention time far exceeded the
criteria, the velocity gradient and configuration of Mixer 1 did not meet the
criteria, the sedimentation basin showed a low overflow rate and
short-circuiting, and the sludge drying beds failed to function due to
non-standard media and drainage. The incoming load ranged from 318.73–361.58 kg
COD/day and 19.93–52.50 kg TSS/day. Overall LTP efficiency for COD was 7%, ?3%,
and ?4%, and for TSS was 22%, ?21%, and 10%, so the effluent still failed to
meet the standards under Regulation of the Minister of Environment and Forestry
No. 59 of 2016. Operationally, problems were found in coagulant dosing, open
bypass channels, filtration media, operating pH, and the absence of an SOP.
Recommendations include operational optimization, unit rehabilitation and
modification, and SOP development. As part of these recommendations, jar
testing with optimum doses of 1,800 mg/L PAC and 50 mg/L NaOCl achieved 76% COD
removal efficiency.
Kata Kunci : Air Lindi, Kriteria Desain, Efisiensi Pengolahan, Instalasi Pengolahan Lindi, TPA Piyungan/Leachate, Design Criteria, Treatment Efficiency, Leachate Treatment Plant, TPA Piyungan