PERENCANAAN PENGEMBANGAN PEMBANGKIT PULAU BADI DENGAN MEMPERTIMBANGKAN ENERGI BARU TERBARUKAN, EMISI KARBON DAN KONTINUITAS SUPLAI
Fariz Saputra, Ir. Lesnanto Multa Putranto, S.T., M.Eng, Ph.D., IPM., SMIEEE. ; Prof. Ir. Sarjiya, S.T., M.T., Ph.D., IPU.
2026 | Tesis | S2 Teknik Elektro
Keterbatasan akses terhadap listrik yang andal terus menghambat pembangunan sosial-ekonomi di banyak komunitas pulau terpencil di Indonesia. Pasokan listrik di wilayah wilayah tersebut umumnya mengandalkan sistem pembangkit berbasis diesel terisolasi yang dicirikan oleh jam operasional terbatas, pengeluaran biaya operasional yang tinggi, serta emisi gas rumah kaca yang signifikan. Penelitian ini membahas kelayakan tekno-ekonomi penerapan mikrogrid hibrida PLTSa–PLTS–baterai untuk pengembangan pembangkit Pulau Badi menggunakan optimasi HOMER Pro. Konfigurasi diesel eksisting dengan total kapasitas terpasang 252 kW menghasilkan Net Present Cost (NPC) sebesar $3,804 juta dan Cost of Energy (COE) sebesar $0,280/kWh, disertai emisi CO? tahunan sebesar 526.940 kg. Hasil optimasi menunjukkan bahwa sistem optimal terdiri dari PLTSa 100 kW, PLTS 56,3 kW, baterai 438,6 kWh, konverter 27,3 kW, serta tiga PLTD yang dipertahankan sebagai cadangan dengan kapasitas 100 kW, 112 kW, dan 40 kW. Konfigurasi yang diusulkan menurunkan NPC menjadi $1,802 juta dan COE menjadi $0,133/kWh, secara signifikan mengurangi NPC dan COE sekaligus penurunan emisi CO? sebesar 91,66%. Hasil ini menunjukkan bahwa mikrogrid hibrida menyediakan konfigurasi yang secara teknis dan kompetitif secara ekonomi dan berkelanjutan pada sistem pulau terisolasi.
Limited access to reliable electricity continues to hinder socioeconomic development in many remote island communities in Indonesia. Electricity supply in these regions generally relies on isolated diesel-based generation systems characterized by limited operating hours, high operational expenditure, and significant greenhouse gas emissions. This study examines the techno-economic feasibility of deploying a hybrid waste-to-energy (WtE)–PV–battery microgrid for power generation expansion on Badi Island, using HOMER Pro optimization. The existing diesel configuration, with a total installed capacity of 252 kW, yields a Net Present Cost (NPC) of $3.804 million and a Cost of Energy (COE) of $0.280/kWh, accompanied by annual CO? emissions of 526,460 kg. The optimization results indicate that the optimal system consist of 100 kW WtE plant, 56.3 kW PV, 438.6 kWh battery, 27.3 kW converter, and three diesel generators retained as backup with capacities of 100 kW, 112 kW, and 40 kW. The proposed configuration reduces the NPC to $1.802 million and the COE to $0.133/kWh, significantly reducing NPC and COE while achieving a CO? emission reduction of 91.66%. These results demonstrate that a hybrid microgrid provides a technically and economically competitive and sustainable configuration for isolated island systems.
Kata Kunci : Sistem hibrida energi baru terbarukan, PLTSa, HOMER, NPC, COE / Hybrid new & renewable energy system, waste-to-energy(WtE), HOMER, NPC, COE