Optimisasi Tekno-Ekonomi dan Analisis Jaringan Distribusi Berbasis Simulasi pada Sistem Hybrid Off-Grid di Pulau Nuca Molas, Nusa Tenggara Timur
Bayu Surya Darus Salam, Ir. Candra Febri Nugraha, S.T., M.Eng.
2026 | Tugas Akhir | D4 TEKNOLOGI REKAYASA ELEKTRO
Sistem kelistrikan hybrid off-grid pada pulau-pulau kecil menghadapi tantangan berupa pertumbuhan beban, degradasi komponen pembangkit, dan keterbatasan kapasitas jaringan distribusi yang dapat menurunkan keandalan sistem dalam jangka panjang. Penelitian ini bertujuan mengoptimalkan konfigurasi sistem hybrid off-grid di Pulau Nuca Molas, Nusa Tenggara Timur, serta mengevaluasi kemampuan jaringan distribusi dalam mengakomodasi perubahan kondisi operasi selama horizon simulasi. Optimisasi dilakukan menggunakan simulasi multi-year selama 25 tahun dengan mempertimbangkan pertumbuhan beban sebesar 4,61% per tahun dan degradasi modul fotovoltaik sebesar 0,5% per tahun. Konfigurasi hasil optimisasi selanjutnya dianalisis menggunakan simulasi load flow dan quasi-dynamic untuk mengevaluasi profil tegangan, pembebanan penghantar, dan kinerja jaringan distribusi. Hasil optimisasi menunjukkan konfigurasi optimum terdiri atas PLTS 710 kW, solar inverter 500 kW, PLTD 112 kW, BESS 1.167 kWh, dan bidirectional converter 400 kW. Konfigurasi tersebut meningkatkan renewable fraction menjadi 99,6%, menurunkan konsumsi bahan bakar diesel dari 43.524 L/tahun menjadi 899 L/tahun, serta menghilangkan unmet load dan capacity shortage selama horizon operasi dengan nilai Net Present Cost sebesar $2.184.132 dan Levelized Cost of Energy sebesar $0,3561/kWh. Hasil analisis jaringan menunjukkan sistem memenuhi batas tegangan SPLN No. 1 Tahun 1995 hingga tahun ke-5. Kondisi undervoltage mulai terjadi pada tahun ke-10 dan kembali muncul pada tahun ke-25 akibat pertumbuhan beban. Peningkatan level tegangan distribusi menjadi 20 kV memberikan kinerja yang lebih baik sebagai alternatif pengembangan jaringan jangka panjang. Integrasi optimisasi multi-year dan analisis jaringan distribusi menghasilkan perencanaan sistem hybrid off-grid yang lebih andal, ekonomis, adaptif, dan berkelanjutan.
Hybrid off-grid power systems on small islands face challenges associated with load growth, component degradation, and limited distribution network capacity that may reduce long-term system reliability. This study aims to optimize the configuration of the hybrid off-grid power system on Nuca Molas Island, East Nusa Tenggara, and evaluate the capability of the distribution network to accommodate operational changes throughout the simulation horizon. The optimization was performed using a 25-year multi-year simulation considering an annual load growth of 4.61% and a photovoltaic module degradation rate of 0.5% per year. The optimal configuration was subsequently evaluated through load flow and quasi-dynamic simulations to assess voltage profiles, conductor loading, and distribution network performance. The optimization results indicate that the optimal configuration consists of a 710 kW photovoltaic system, a 500 kW solar inverter, a 112 kW diesel generator, a 1,167 kWh battery energy storage system, and a 400 kW bidirectional converter. This configuration increases the renewable fraction to 99.6%, reduces annual diesel fuel consumption from 43,524 L to 899 L, and eliminates unmet load and capacity shortage throughout the operating horizon, with a Net Present Cost of $2,184,132 and a Levelized Cost of Energy of $0.3561/kWh. Distribution network analysis shows that the system satisfies the SPLN No. 1 Tahun 1995 voltage limits until the fifth year. Undervoltage conditions begin to appear in the tenth year and reoccur in the twenty-fifth year due to load growth. Upgrading the distribution voltage level to 20 kV provides a more effective long-term network development alternative. Integrating multi-year optimization with distribution network analysis enables more reliable, economical, adaptive, and sustainable hybrid off-grid system planning.
Kata Kunci : jatuh tegangan, optimisasi tekno-ekonomi, sistem hybrid off-grid, simulasi multi-year