Penentuan Sub-DAS Prioritas Di Hulu Sungai Progo Menggunakan Pemodelan SWAT+
Abdurrahman, Dr. Nugroho Christanto, S.Si., M.Si.
2026 | Skripsi | GEOGRAFI DAN ILMU LINGKUNGAN
Approximately 47% of land use in Temanggung Regency, located within the Upper Progo Watershed, is allocated for agricultural areas. Most agricultural activities are conducted on sloping land. These conditions have the potential to increase surface runoff, soil erosion, and river sedimentation. This study aimed to analyze sediment yield and surface runoff in the Upper Progo Watershed and to determine priority sub-watersheds based on sediment yield and surface runoff parameters.
This research was conducted by modeling the hydrological parameters of surface runoff and sediment yield using the Soil and Water Assessment Tool (SWAT+). The modeling process integrated various spatial and climatological datasets, including Digital Elevation Model (DEM), land use, soil type, rainfall, temperature, humidity, wind speed, and solar radiation data. SWAT+ model evaluation was required to assess the model’s capability in representing the actual hydrological conditions of the Upper Progo Watershed. The evaluation stage was carried out to ensure that the simulation results, particularly surface runoff and sediment yield, had acceptable reliability and could be confidently used for further analysis. Model evaluation was performed by comparing simulated discharge data with observed discharge data using three statistical parameters: Nash–Sutcliffe Efficiency (NSE), coefficient of determination (R²), and Percent Bias (PBIAS). The simulation results of surface runoff and sediment yield were then used as the basis for determining priority sub-watersheds in the Upper Progo Watershed.
The results showed that the Upper Progo Watershed had an average annual runoff coefficient of 0.58, which is classified as very high. Sub-watershed 1 had the highest runoff coefficient value of 0.75, while Sub-watersheds 2 and 3 had the lowest value of 0.44. Most sub-watersheds were classified within the moderate category of sediment yield. Sub-watershed 1 contributed the highest sediment yield at 215.3 tons/ha/year, whereas the lowest contribution was recorded in Sub-watershed 11 at 30.6 tons/ha/year. Priority I areas consisted of Sub-watersheds 1. Priority II areas consisted of Sub-watersheds 2, 3, 4, 5, 6, 7, 10, and 11. Priority III areas consisted of Sub-watersheds 8 and 9.
Kata Kunci : hasil sedimen, limpasan permukaan, pemodelan hidrologi, sub-DAS prioritas, SWAT / sediment yield, surface runoff, hydrological modeling, priority sub-watersheds, SWAT