Evaluasi dan Optimasi Konfigurasi Sistem PLTS Off-Grid Menggunakan PVsyst untuk Mendukung Operasi Sistem Monitoring Gas Metana
Hendrikus Bagas Pangestu, Dr. Fitri Puspasari, S.Si., M.Sc.
2026 | Tugas Akhir | D4 TEKNOLOGI REKAYASA ELEKTRO
Kebutuhan energi listrik yang stabil menjadi tantangan utama sistem monitoring gas metana berbasis real-time 24 jam di lokasi terisolasi. Penelitian ini bertujuan menghitung kebutuhan energi sistem monitoring, merancang Pembangkit Listrik Tenaga Surya (PLTS) off-grid sebagai catu daya mandiri, serta mengevaluasi kesesuaian simulasi PVsyst dengan implementasi aktual berdasarkan parameter Performance Ratio (PR) dan produksi energi. Metodologi meliputi analisis beban, perancangan perangkat keras PLTS skala kecil, pengumpulan data iradiasi, simulasi PVsyst, dan pengujian lapangan. Hasil penelitian menunjukkan beban monitoring berhasil dipenuhi secara mandiri oleh rancangan PLTS off-grid berkapasitas panel surya 20 Wp dan baterai 15 Ah/12 V. Simulasi PVsyst untuk skenario operasi 24 jam menghasilkan kinerja baik dengan PR di atas 70%, sedangkan skenario jam pakan menghasilkan PR sekitar 24%. Validasi antara hasil simulasi dan implementasi nyata menunjukkan tingkat akurasi tinggi. Persentase eror PR berada pada kategori sangat baik (3,95%–4%), sementara eror produksi energi PV berkategori baik (16,15%). Akurasi ini diperkuat nilai Mean Absolute Percentage Error (MAPE) untuk PR Skema Periodik Jam Pakan sebesar 5,14?n PR Menyala 24 Jam sebesar 6,67% (Kategori Sangat Baik), serta MAPE Produksi Energi PV sebesar 23,70% (Kategori Layak). Dengan demikian, simulasi PVsyst terbukti akurat dan representatif untuk memproyeksikan kondisi aktual sistem PLTS off-grid skala kecil di lapangan melalui tahapan evaluasi tersebut.
Stable electrical energy supply is the main challenge for operating a 24-hour real-time methane gas monitoring system in isolated locations. This study aims to calculate the energy requirements of the monitoring system, design an off-grid Solar Power System (PLTS) as an independent power supply, and evaluate the alignment between PVsyst software simulations and actual field implementation based on the Performance Ratio (PR) and energy production parameters. The methodology includes load analysis, small-scale PLTS hardware design, solar irradiation data collection, PVsyst performance simulation, and actual field testing. The results show that the monitoring system’s energy demands are successfully met independently by the off-grid PLTS design with a 20 Wp solar panel capacity and a 15 Ah/12 V battery storage. The PVsyst simulation for the 24-hour operation scenario yields good performance with a PR above 70%, while the feeding-hour scenario results in a lower PR of around 24%. Validation between simulation and actual implementation indicates a high level of accuracy. The error percentage for PR falls into the excellent category at 3.95%–4%, while the error for PV energy production is in the good category at 16.15%. This accuracy is reinforced by the Mean Absolute Percentage Error (MAPE) values, with the PR for the Periodic Feeding-Hour Scheme at 5.14% and the 24-Hour Operation PR at 6.67% (Excellent Category), alongside a PV Energy Production MAPE of 23.70% (Good/Feasible Category). Thus, PVsyst simulation proves to be accurate and representative for projecting the actual conditions of small-scale off-grid solar power systems in the field through this evaluation phase.
Kata Kunci : Monitoring Gas Metana, Performance Ratio,PLTS Off-Grid, PVsyst.