ANALISIS RESETTING DISTANCE RELAY PASCA PENGGANTIAN CURRENT TRANSFORMER PADA BAY GEJAYAN 2 GI KENTUNGAN BERBASIS VERIFIKASI SCANNING DISTANCE DAN SIMULASI DIGSILENT POWERFACTORY

Putri Nilam Sari, Dr. Fitri Puspasari, S.Si., M.Sc.

2026 | Tugas Akhir | D4 TEKNOLOGI REKAYASA ELEKTRO

Pemasangan sistem busbar protection di GI Kentungan mengharuskan penggantian current transformer (CT) pada Bay Gejayan 2 dari rasio 500/1 A menjadi 600/1 A. Perubahan rasio CT ini mengubah faktor konversi impedansi dari k = 0,333 menjadi k = 0,400, sehingga seluruh setting zona proteksi distance relay CSC-103 merk SIFANG menjadi tidak sesuai. Apabila setting lama dipertahankan, relay berpotensi mengalami underreach sehingga gangguan tidak terdeteksi sebagaimana mestinya dan berpotensi mengganggu keandalan sistem penyaluran tenaga listrik. Penelitian ini bertujuan menghitung nilai resetting distance relay pasca penggantian CT, menganalisis kesesuaian hasil pengujian scanning distance terhadap hasil simulasi, serta menganalisis kinerja relay pada kondisi pra-resetting dan pasca-resetting maupun pada titik krusial batas zona melalui simulasi DIgSILENT PowerFactory.Metode yang digunakan adalah kombinasi perhitungan manual impedansi sekunder, analisis data pengujian scanning distance menggunakan Omicron CMC 356, dan simulasi gangguan hubung singkat tiga fasa menggunakan DIgSILENT PowerFactory versi 2024. Simulasi dilakukan pada dua skenario, yaitu pra-resetting dengan CT baru menggunakan setting lama, dan pasca-resetting dengan CT baru menggunakan setting hasil perhitungan ulang. Hasil penelitian menunjukkan bahwa perubahan rasio CT mengubah nilai impedansi sekunder zona proteksi, dengan setting baru Zone 1 = 0,3037 ?, Zone 2 = 0,4556 ?, dan Zone 3 = 0,8352 ?, menggantikan setting lama Zone 1 = 0,2531 ?, Zone 2 = 0,3796 ?, dan Zone 3 = 0,6960 ?. Seluruh nilai error impedansi hasil pengujian scanning distance berada di bawah 5%, di bawah batas toleransi standar PT PLN (Persero). Simulasi pra-resetting membuktikan terjadinya underreach pada seluruh zona, di mana gangguan pada Zone 1 terdeteksi sebagai Zone 2 dengan waktu tripping 0,43 detik, gangguan pada Zone 2 terdeteksi sebagai Zone 3 dengan waktu tripping 1,63 detik, dan gangguan pada Zone 3 sama sekali tidak terdeteksi. Pasca-resetting, seluruh zona bekerja sesuai jangkauan dan waktu tripping yang seharusnya. Pengujian titik krusial pada 79?n 81% saluran menunjukkan relay mampu membedakan gangguan di dalam dan di luar batas Zone 1, meskipun dengan margin impedansi yang sangat tipis. Hasil penelitian ini diharapkan dapat menjadi referensi metodologi analisis resetting distance relay akibat perubahan rasio CT pada bay transmisi 150 kV. 

The installation of a busbar protection system at GI Kentungan required the replacement of the current transformer (CT) at Bay Gejayan 2, changing the ratio from 500/1 A to 600/1 A. This change in CT ratio altered the impedance conversion factor from k = 0,333 to k = 0,400, rendering all protection zone settings of the SIFANG CSC-103 distance relay no longer valid. If the old settings were retained, the relay would potentially experience underreach, causing faults to go undetected as intended and threatening the reliability of the power transmission system. This study aims to calculate the resetting values of the distance relay after CT replacement, analyze the conformity of scanning distance test results against theoretical calculations, and evaluate the relay performance under pre-resetting and post-resetting conditions as well as at the critical points of the zone boundaries through DIgSILENT PowerFactory simulation. The method used is a combination of manual calculation of secondary impedance, analysis of scanning distance test data using the Omicron CMC 356, and three-phase short-circuit fault simulation using DIgSILENT PowerFactory version 2024. Simulations were carried out in two scenarios, namely pre-resetting with the new CT using old settings, and post-resetting with the new CT using recalculated settings. The results show that the change in CT ratio altered the secondary impedance values of the protection zones, with new settings of Zone 1 = 0.3037 ?, Zone 2 = 0.4556 ?, and Zone 3 = 0.8352 ?, replacing the old settings of Zone 1 = 0.2531 ?, Zone 2 = 0.3796 ?, and Zone 3 = 0.6960 ?. All impedance error values from the scanning distance testing remained below 1%, well within the PT PLN (Persero) standard tolerance limit. The pre-resetting simulation demonstrated underreach across all zones, where a fault at Zone 1 was detected as Zone 2 with a tripping time of 0.43 seconds, a fault at Zone 2 was detected as Zone 3 with a tripping time of 1.63 seconds, and a fault at Zone 3 was not detected at all. After resetting, all protection zones operated according to their intended reach and tripping times. Critical point testing at 79% and 81% of the line length showed that the relay was able to distinguish faults inside and outside the Zone 1 boundary, albeit with a very thin impedance margin. The findings of this study are expected to serve as a methodological reference for distance relay resetting analysis due to CT ratio changes on 150 kV transmission bays.

Kata Kunci : Current Transformer, Distance Relay, Resetting, Scanning Distance, Simulasi