Laporkan Masalah

PERANCANGAN PLTS PADA SISTEM ISOLATED GRID KAWASAN TRANSMIGRASI PATLEAN DENGAN SIMULASI ALIRAN DAYA

Tristan Muhammad Hammaam, Bapak Muhammad Rifqi Al Fauzan, S.Si., M.Si.,

2026 | Tugas Akhir | D4 TEKNOLOGI REKAYASA ELEKTRO

Kawasan Transmigrasi Patlean, Halmahera Timur, Maluku Utara, merupakan kawasan terpencil yang bergantung pada Pembangkit Listrik Tenaga Diesel (PLTD), menimbulkan biaya operasional tinggi dan emisi gas rumah kaca. Penelitian ini merancang sistem Pembangkit Listrik Tenaga Surya (PLTS) pada isolated grid pengganti PLTD eksisting dan mensimulasikan aliran daya untuk memvalidasi kelayakan teknisnya. Beban total 322,25 kW (residensial, Rumah Sakit, cold storage) dengan kebutuhan energi 7.734 kWh/hari. Menggunakan metode Deele et al. (2020), diperoleh PV array 2.044,9 kWp (3.718 modul Trina Solar TSM-DEG19C.20, 22S×169P). BESS teoritis 22.752 kWh (otonomi 2 hari, DOD 80%) diimplementasikan menggunakan 113 unit EVLithium BR-15-720/280-F (22.780,8 kWh), dengan PCS off-grid 500 kW terhubung ke jaringan 20 kV melalui trafo step-up 630 kVA. Simulasi aliran daya pada jaringan radial 20 kV (dua feeder, 16 gardu, 71 km) menggunakan DIgSILENT PowerFactory 2024 dilakukan dalam dua skenario. Skenario 1 (Trafo Wasileo 100 kVA) menunjukkan tegangan 33 bus normal (0,908–1,000 p.u., Permen ESDM No. 4/2009), namun trafo overloading 247,8% akibat beban 190,43 kW, sehingga direkomendasikan upgrade ke 315 kVA (SPLN D3.002-1:2007). Skenario 2 (Trafo 315 kVA) menunjukkan tegangan membaik menjadi 0,957–1,000 p.u. dan loading trafo turun ke 75,2% (Edaran Direksi PT PLN No. 0017.E/DIR/2014). Rugi-rugi saluran identik, tertinggi 0,011 kW per segmen, jauh di bawah susut jaringan PLN 5,61% (RUPTL PLN 2021–2030). Sistem PLTS pada isolated grid Kawasan Transmigrasi Patlean dinyatakan layak teknis setelah peningkatan trafo Wasileo menjadi 315 kVA.

The Patlean Transmigration Area in East Halmahera Regency, North Maluku Province, is a remote area that relies on Diesel Power Plants (PLTD), resulting in high operational costs and greenhouse gas emissions. This study designs a Solar Power Plant (PLTS) system on an isolated grid to replace the existing PLTD and simulates power flow to validate its technical feasibility. The total load served is 322.25 kW (residential, hospital, cold storage) with an energy demand of 7,734 kWh/day. Using the method of Deele et al. (2020), a PV array of 2,044.9 kWp was obtained (3,718 Trina Solar TSM-DEG19C.20 modules, 22S×169P). The theoretical BESS requirement of 22,752 kWh (2-day autonomy, 80% DOD) was implemented using 113 EVLithium BR-15-720/280-F units (22,780.8 kWh installed), with a 500 kW off-grid PCS connected to the 20 kV grid through a 630 kVA step-up transformer. Power flow simulation on the 20 kV radial network (two feeders, 16 substations, 71 km) using DIgSILENT PowerFactory 2024 was conducted for two scenarios. Scenario 1 (100 kVA Wasileo Transformer) showed normal voltage across 33 buses (0.908–1.000 p.u., per Permen ESDM No. 4/2009), but the transformer was severely overloaded at 247.8% due to a 190.43 kW cumulative load, leading to a recommended upgrade to 315 kVA (SPLN D3.002-1:2007). Scenario 2 (315 kVA transformer) showed improved voltage of 0.957–1.000 p.u. and transformer loading reduced to an adequate 75.2% (PT PLN Directors’ Circular No. 0017.E/DIR/2014). Line losses were identical in both scenarios, with a maximum of 0.011 kW per segment, well below the PLN network loss realization of 5.61% (RUPTL PLN 2021–2030). The PLTS system on the isolated grid for the Patlean Transmigration Area is technically feasible following the upgrade of the Wasileo distribution transformer to 315 kVA.

Kata Kunci : Aliran Daya, BESS, DIgSILENT PowerFactory, Kawasan Transmigrasi, Patlean, PLTS off-grid, Sistem Distribusi 20 kV

  1. D4-2026-504833-abstract.pdf  
  2. D4-2026-504833-bibliography.pdf  
  3. D4-2026-504833-tableofcontent.pdf  
  4. D4-2026-504833-title.pdf