Optimisasi Penempatan dan Kapasitas Battery Energy Storage System untuk Primary Frequency Control dengan Particle Swarm Optimization Berbasis Simulasi
Ahmad Farobi Izzulhaq, Ir. Candra Febri Nugraha, S.T., M.Eng.
2026 | Tugas Akhir | D4 TEKNOLOGI REKAYASA ELEKTRO
Peningkatan penetrasi pembangkit berbasis energi terbarukan dalam sistem tenaga listrik berpotensi menurunkan stabilitas frekuensi akibat berkurangnya kontribusi inersia sistem dan meningkatnya variabilitas daya. Integrasi BESS dapat menjadi solusi, namun juga meningkatkan biaya sistem sehingga diperlukan perencanaan kapasitas optimal menggunakan metode optimisasi. Penelitian ini bertujuan menentukan lokasi dan kapasitas optimal BESS sebagai PFC dengan durasi operasi selama 30 detik menggunakan metode PSO, menentukan kapasitas energi minimum BESS, mengevaluasi peningkatan stabilitas frekuensi setelah pemasangan BESS, serta menganalisis dampak integrasi VRE terhadap hasil optimisasi. Penelitian dilakukan pada sistem IEEE 14 bus yang dimodifikasi menggunakan DIgSILENT PowerFactory dengan skenario gangguan berupa pelepasan generator terbesar. Optimisasi dilakukan dengan meminimalkan kapasitas daya BESS berdasarkan batas frekuensi nadir, RoCoF, dan pembebanan komponen sistem. Hasil penelitian menunjukkan bahwa lokasi optimal BESS berada pada bus 2 untuk skenario tanpa integrasi VRE dengan kapasitas daya optimal 205,71–323,21 MW untuk memenuhi target frekuensi nadir sebesar 49,30–49,50 Hz dan RoCoF sebesar 1,00–0,40 Hz/s dan kebutuhan kapasitas energi minimum 3,59–3,89 MWh untuk mendukung operasi PFC selama 30 detik. Pemasangan BESS meningkatkan frekuensi nadir dari 42,77 Hz menjadi 49,30–49,79 Hz serta memperbaiki RoCoF dari 2,96 Hz/s menjadi 0,79 hingga 0,41 Hz/s. Integrasi VRE sebagai pengganti generator sinkron menurunkan stabilitas frekuensi, ditunjukkan oleh penurunan frekuensi nadir menjadi 40,24 Hz dan peningkatan RoCoF menjadi 3,56 Hz/s. Selain itu, lokasi optimal berpindah dari bus 2 menjadi bus 5, sementara kapasitas BESS meningkat menjadi 207,57 MW/3,68 MWh dibandingkan 205,71 MW/3,59 MWh pada sistem eksisting dengan nilai kekangan yang sama. PSO menunjukkan konsistensi yang baik dengan nilai CV sebesar 0,0014659%. Hasil penelitian menunjukkan bahwa BESS berkapasitas dan berlokasi optimal mampu meningkatkan stabilitas frekuensi sistem tenaga listrik secara efektif, termasuk pada kondisi dengan integrasi VRE.
The increasing penetration of renewable energy-based power plants in the electric power system has the potential to reduce frequency stability due to a decrease in system inertia and increased power variability. The integration of BESS can be a solution, but it also increases system costs, making it necessary to plan for optimal capacity using optimization methods. This study aims to determine the optimal location and capacity of a BESS as a PFC with an operating duration of 30 seconds using the PSO method, determine the minimum energy capacity of the BESS, evaluate the improvement in frequency stability after BESS installation, and analyze the impact of VRE integration on the optimization results. The study was conducted on a modified IEEE 14-bus system using DIgSILENT PowerFactory with a disturbance scenario involving the tripping of the largest generator. Optimization was performed by minimizing the BESS power capacity based on the nadir frequency limit, RoCoF, and system component loading. The results show that the optimal location for the BESS is at bus 2 for the scenario without VRE integration, with an optimal power capacity of 205.71–323. 21 MW to meet the nadir frequency target of 49.30–49.50 Hz and RoCoF of 1.00–0.40 Hz/s, as well as a minimum energy capacity requirement of 3.59–3.89 MWh to support PFC operation for 30 seconds. The installation of the BESS increased the nadir frequency from 42.77 Hz to 49.30–49.79 Hz and improved the RoCoF from 2.96 Hz/s to 0.79–0.41 Hz/s. The integration of VRE as a replacement for synchronous generators reduced frequency stability, as indicated by a decrease in the nadir frequency to 40.24 Hz and an increase in RoCoF to 3.56 Hz/s. Furthermore, the optimal location shifted from bus 2 to bus 5, while the BESS capacity increased to 207.57 MW/3.68 MWh compared to 205.71 MW/3.59 MWh in the existing system with the same constraint values. The PSO algorithm demonstrated good consistency with a CV value of 0.0014659%. The research results show that a BESS with optimal capacity and location can effectively improve the frequency stability of the power system, including under conditions involving VRE integration.
Kata Kunci : Battery Energy Storage System (BESS), Particle Swarm Optimization (PSO), Frequency Stability, Primary Frequency Control (PFC)