EVALUASI POTENSI OVERTOPPING BENDUNGAN BENER AKIBAT PROBABLE MAXIMUM FLOOD DENGAN HEC-HMS
Mashita Ayu Suryaningrum, Prof. Ir. Joko Sujono, M.Eng., Ph.D., IPU.
2026 | Skripsi | TEKNIK SIPIL
Bendungan
Bener merupakan bendungan tipe Concrete Face Rockfill Dam (CFRD) yang
berlokasi di Kabupaten Purworejo, Jawa Tengah, dengan kapasitas tampungan 90,39
juta m³ dan direncanakan sebagai penyedia air baku, irigasi, pembangkit
listrik, serta pengendali banjir. Salah satu ancaman terhadap keamanan
bendungan adalah overtopping, yaitu kondisi ketika muka air waduk
melimpas melewati puncak bendungan dan berpotensi memicu keruntuhan. Oleh
karena itu, evaluasi kapasitas pelimpah melalui penelusuran banjir waduk perlu
dilakukan untuk mengetahui elevasi muka air maksimum pada kondisi banjir
ekstrem. Penelitian ini bertujuan menghitung hidrograf Probable Maximum
Flood (PMF), membandingkan hasil perhitungan manual dengan pemodelan
HEC-HMS, melakukan reservoir routing, serta mengevaluasi potensi overtopping
berdasarkan elevasi muka air maksimum terhadap elevasi puncak bendungan.
Data hujan
yang digunakan berasal dari satelit Global Precipitation Measurement
(GPM) IMERG periode 1998–2025. Nilai Probable Maximum Precipitation
(PMP) dihitung dengan metode Hershfield dan diperoleh sebesar 392,56 mm.
Distribusi hujan dianalisis menggunakan metode Huff-1, PSA 007 dan Observed
Pattern, sedangkan hujan efektif dihitung menggunakan metode SCS-CN pada
kondisi AMC III. Transformasi hujan-aliran dilakukan menggunakan HSS Gama-I dan
HSS Nakayasu, kemudian hidrograf yang dihasilkan ditelusuri melalui waduk
menggunakan HEC-HMS.
Debit puncak inflow terbesar terjadi pada skenario Nakayasu-Huff-1 sebesar 1400,70 m³/s. Perbandingan antara perhitungan manual dan HEC-HMS menunjukkan deviasi debit puncak kurang dari 1%. Hasil reservoir routing menunjukkan elevasi muka air maksimum tertinggi sebesar +353,39 m pada skenario Gama-I Huff-1, sehingga masih terdapat tinggi jagaan 2,61 m terhadap puncak bendungan. Seluruh skenario memenuhi kriteria kapasitas pelimpah berdasarkan SNI 3432:2020. Dengan demikian, berdasarkan analisis hidrologis dan reservoir routing, Bendungan Bener tidak berpotensi mengalami overtopping pada skenario PMF yang dianalisis.
Bener
Dam is a Concrete Face Rockfill Dam (CFRD) located in Purworejo Regency,
Central Java, with a storage capacity of 90,39 million m³. The dam is designed
to support raw water supply, irrigation, hydropower generation, and flood
control. One of the potential threats to dam safety is overtopping, a condition
in which the reservoir water level exceeds the dam crest and may lead to dam
failure. Therefore, spillway capacity evaluation through reservoir flood
routing is required to determine the maximum reservoir water level under
extreme flood conditions. This study aims to calculate the Probable Maximum
Flood (PMF) hydrograph, compare manual calculation results with HEC-HMS
modeling, perform reservoir routing, and evaluate the potential for overtopping
based on the maximum water level relative to the dam crest elevation.
The
rainfall data used in this study were obtained from the Global Precipitation
Measurement (GPM) IMERG satellite product for the period 1998–2025. The
Probable Maximum Precipitation (PMP) was calculated using the Hershfield
method, resulting in a value of 392,56 mm. Rainfall distribution was analyzed
using the Huff-1, PSA 007 and Observed Pattern methods, while effective
rainfall was calculated using the SCS-CN method under AMC III conditions.
Rainfall-runoff transformation was carried out using the Gama-I and Nakayasu
Synthetic Unit Hydrographs, and the resulting hydrographs were then routed through
the reservoir using HEC-HMS.
The highest peak inflow occurred in the Nakayasu-Huff-1 scenario, with a discharge of 1400,70 m³/s. The comparison between manual calculations and HEC-HMS modeling showed peak discharge deviations of less than 1%. The reservoir routing results indicated that the highest maximum reservoir water level occurred in the Gama-I-Huff-1 scenario, reaching +353,39 m, leaving a remaining freeboard of 2,61 m below the dam crest. All analyzed scenarios satisfied the spillway capacity criteria based on SNI 3432:2020. Therefore, based on the hydrological analysis and reservoir routing results, Bener Dam does not indicate overtopping potential under the analyzed PMF scenario.
Kata Kunci : Bendungan Bener, overtopping, PMF, reservoir routing, HEC-HMS