Proses pendataan dan dokumentasi maintenance alat
berat pada PT Perwita selama ini masih menggunakan media konvensional berupa
kertas fisik yang rantan rusak dan hilang, sehingga menyulitkan analisis rekam
jejak perawatan unit secara akurat. Penelitian ini bertujuan untuk mendesain
dan membangun sistem informasi maintenance digital berbasis website
untuk unit wheel loader merek Komatsu tipe WA350 pada pekerjaan Asphalt
Mixing Plant (AMP) serta menganalisis keandalan unit menggunakan matode
distribusi Weibull dengan pendekatan Maximum Likelihood Estimation
(MLE). Sistem informasi ini dikembangkan menggunakan bahasa pemrograman PHP
dengan database yang digunakan adalah MySQL, dan diunggah secara daring
melalui layanan cloud hosting bernama Hostinger. Berdasarkan 24 data
kerusakan yang diperoleh pada periode bulan Januari 2025 hingga Maret 2026,
diperoleh data Time To Failure (TTF) sejumlah 23 data. Dari jumlah data
TTF yang ada, sistem membuat perhitungan otomatis nilai Shape Parameter (?)
sebesar 3,5847 dan Scale Parameter (?) sebesar 90,47 jam. Hasil
perhitungan tersebut mendandakan jenis kerusakan yang dialami yaitu increasing
failure rate akibat keausan mekanis, dengan nilai median sebesar 81,68 jam
operasional kedepan. Implementasi sistem informasi maintenance ini
mengintegrasikan monitoring, pencatatan dan analisis kalkulasi maintenance
pada unit alat berat.
The
process of data collection and maintenance documentation for heavy equipment at
PT Perwita has previously relied on conventional physical paper media, which is
prone to damage and loss, thereby complicating accurate unit maintenance track
record analysis. This study aims to design and develop a web-based digital
maintenance information system for a Komatsu WA350 wheel loader operating in an
Asphalt Mixing Plant (AMP), as well as to analyze the unit's reliability using
the Weibull distribution method with a Maximum Likelihood Estimation (MLE)
approach. The information system was developed using the PHP programming
language with a MySQL database and was uploaded online via the Hostinger cloud
hosting service. Based on 24 failure data points obtained from January 2025 to
March 2026, a total of 23 Time To Failure (TTF) data points were derived. From
the available TTF data, the system automatically calculated a Shape Parameter
($\beta$) of 3.5847 and a Scale Parameter ($\eta$) of 90.47 hours. These
calculation results indicate that the type of failure experienced is an
increasing failure rate caused by mechanical wear, with a median value of 81.68
subsequent operational hours. The implementation of this maintenance
information system successfully integrates the monitoring, recording, and
calculation analysis of heavy equipment unit maintenance.
Kata Kunci : Digitalisasi Maintenance, Wheel Loader, Website, Weibull, Maximum Likelihood Estimation.