Evaluasi Implementasi Manajemen Lalu Lintas Pada Saat Pekerjaan Erection girder: Pembangunan Proyek Jalan Tol Solo-Yogyakarta Seksi II Paket 2.2B

Audi Muthia Aqila, Dr. Ir. Dewanti, M.S.

2026 | Skripsi | TEKNIK SIPIL

Jalan Tol Jogja–Solo merupakan salah satu proyek infrastruktur penting yang diharapkan dapat meningkatkan konektivitas antara wilayah Yogyakarta, Solo, dan Bandara YIA di Kulon Progo. Penelitian ini mengevaluasi implementasi manajemen lalu lintas pada pekerjaan erection girder bentang P4A–P5A pada proyek Jalan Tol Solo–Yogyakarta. Pekerjaan ini berlangsung pada koridor lalu lintas aktif sehingga memerlukan pengaturan lalu lintas untuk menjaga keselamatan pekerja, pengguna jalan, dan kelancaran arus kendaraan. Penelitian ini menggunakan pendekatan deskriptif evaluatif dengan membandingkan dokumen Rencana Manajemen Lalu Lintas Pekerjaan (RMLLP), rencana operasional tim lapangan, dokumentasi visual, dan hasil wawancara semi-terstruktur. Evaluasi dilakukan menggunakan checklist dikotomis terhadap 18 indikator yang mencakup aspek perencanaan, zonasi, personel dan pengaturan, perlengkapan sementara, serta penutupan dan akses. Hasil skoring kemudian diinterpretasikan menggunakan kriteria ordinal untuk mengetahui tingkat kesesuaian implementasi. Hasil penelitian menunjukkan bahwa implementasi manajemen lalu lintas pada bentang P4A–P5A berada pada kategori sangat tinggi. Sebagian besar indikator dapat diverifikasi dalam pelaksanaan, meskipun beberapa penerapannya bersifat kondisional. Dinamika lapangan dipengaruhi oleh posisi crane, pergerakan multiaxle, keterbatasan ruang kerja, sistem buka-tutup, pengalihan arus, serta kebutuhan respons terhadap kondisi tidak terduga, seperti kendaraan darurat dan pengguna jalan yang menerobos area tertutup. Temuan penelitian menunjukkan bahwa RMLLP telah berfungsi sebagai dasar pengaturan, tetapi masih perlu diterjemahkan ke dalam rencana operasional yang lebih rinci untuk pekerjaan elevated pada koridor lalu lintas aktif. Strategi yang disarankan meliputi joint survey, validasi ruang alat berat, pembaruan rambu per bentang, penyusunan SOP kendaraan darurat, dan pencatatan kejadian lapangan.

The Jogja–Solo Toll Road is one of the strategic infrastructure projects expected to improve connectivity between Yogyakarta, Solo, and YIA Airport in Kulon Progo. This study evaluates the implementation of traffic management during the girder erection work at span P4A–P5A of the Solo–Yogyakarta–NYIA Kulon Progo Toll Road project. The work was carried out along an active traffic corridor, requiring proper traffic management to ensure the safety of workers, road users, and the smooth flow of traffic. This study applies a descriptive evaluative approach by comparing the Work Traffic Management Plan (RMLLP), field operational plans, visual documentation, and results from semi-structured interviews. The evaluation was conducted using a dichotomous checklist consisting of 18 indikators, covering aspects of planning, zoning, personnel and control, temporary traffic equipment, as well as closures and access. The scoring results were then interpreted using ordinal criteria to determine the level of implementation conformity. The results indicate that the implementation of traffic management at span P4A–P5A falls into the very high category. Most indikators were verified in practice, although some were implemented conditionally. Field dynamics were influenced by crane positioning, multiaxle movement, limited working space, open-close traffic control, traffic diversion, and the need to respond to unexpected conditions such as emergency vehicles and unauthorized road users entering restricted areas. The findings show that the RMLLP has functioned as the baseline for traffic management; however, it still requires further translation into more detailed operational plans, particularly for elevated construction work on active traffic corridors. Recommended strategies include conducting joint surveys, validating heavy equipment working space, updating traffic signs for each span, preparing emergency vehicle procedures, and documenting field incidents.

Kata Kunci : RMLLP, traffic management, girder erection, work zone, toll road.

  1. S1-2026-505591-abstract.pdf  
  2. S1-2026-505591-bibliography.pdf  
  3. S1-2026-505591-tableofcontent.pdf  
  4. S1-2026-505591-title.pdf