Integrasi Pembangkit Listrik Tenaga Surya (PLTS) dalam sistem kelistrikan menghadapi tantangan berupa ketidaksesuaian temporal antara produksi energi surya pada siang hari dan kebutuhan beban puncak malam. Kondisi ini relevan pada Subsistem Madura, khususnya Guluk-Guluk, yang direncanakan sebagai lokasi pengembangan PLTS dan Battery Energy Storage System (BESS). Penelitian ini bertujuan menentukan kapasitas optimum sistem PLTS-BESS dengan konfigurasi PV-only charging, yaitu skema pengisian baterai yang hanya bersumber dari PLTS tanpa dukungan pengisian dari jaringan listrik, untuk memenuhi beban puncak malam secara andal dan efisien dengan mempertimbangkan degradasi baterai serta kapasitas Power Conversion System (PCS).

Penelitian dilakukan menggunakan simulasi time-series selama horizon proyek 25 tahun berbasis data iklim tropis di lokasi studi. Degradasi baterai dimodelkan melalui mekanisme calendar aging dan cycle aging, sedangkan optimasi kapasitas PV dan BESS dilakukan menggunakan algoritma Particle Swarm Optimization (PSO). Fungsi objektif yang digunakan adalah minimisasi Net Present Cost (NPC) dan penalti unmet energy, sehingga optimasi mempertimbangkan keseimbangan antara biaya sistem dan keandalan suplai beban puncak malam. Analisis sensitivitas dilakukan untuk mengevaluasi pengaruh variasi kapasitas PCS terhadap kinerja sistem.

Hasil penelitian menunjukkan bahwa konfigurasi optimum pada skenario dasar PCS 50 MW diperoleh pada kapasitas PV sekitar 75 MWp dan kapasitas awal BESS sekitar 571 MWh, dengan reliability 83,85?n NPC sekitar USD 269 juta. Variabilitas energi surya harian menjadi faktor dominan yang memengaruhi reliability, sedangkan degradasi baterai bukan faktor utama penentu kegagalan pemenuhan energi pada konfigurasi optimum. Peningkatan PCS hingga sekitar 56 MW memberikan peningkatan reliability yang signifikan, sehingga perencanaan PLTS-BESS perlu mempertimbangkan kapasitas PLTS, BESS, dan PCS secara terpadu.

The integration of solar photovoltaic (PV) generation into power systems faces a key challenge due to the temporal mismatch between daytime solar energy production and nighttime peak load demand. This issue is relevant to the Madura subsystem, particularly Guluk-Guluk, which is planned as a development site for a solar PV and Battery Energy Storage System (BESS) project. This study aims to determine the optimal capacity of a PV-BESS system under a PV-only charging configuration, in which the battery is charged solely by PV generation without grid-charging support, to supply nighttime peak load reliably and efficiently while considering battery degradation and Power Conversion System (PCS) capacity.

The study employs a 25-year time-series simulation based on tropical climate data at the study location. Battery degradation is modeled through calendar aging and cycle aging mechanisms, while PV and BESS capacities are optimized using the Particle Swarm Optimization (PSO) algorithm. The objective function minimizes Net Present Cost (NPC) and unmet energy penalty, thereby balancing system cost and nighttime peak load supply reliability. A sensitivity analysis is also conducted to evaluate the effect of PCS capacity variation on system performance.

The results show that, under the baseline PCS capacity of 50 MW, the optimal configuration consists of approximately 75 MWp of PV and 571 MWh of initial BESS capacity, achieving 83.85% reliability with an NPC of approximately USD 269 million. Daily solar energy variability is identified as the dominant factor affecting system reliability, while battery degradation is not the primary cause of energy supply failure in the optimal configuration. Increasing the PCS capacity to approximately 56 MW significantly improves reliability, indicating that PV-BESS planning should consider PV, BESS, and PCS capacities in an integrated manner.

Kata Kunci : PLTS-BESS, PV-only charging, beban puncak malam, Guluk-Guluk Madura, degradasi baterai, Particle Swarm Optimization