Analisis Efektivitas Biaya Dan Performa Unit Bulldozer Kapasitas 20 Ton. Dengan Metode Overall Equipment Effectiveness Terhadap Preventive Maintenance Package
Aisyah Ramadhani, Radhian Krinaputra, S.T., M.Eng.
2025 | Tugas Akhir | D4 TEKNIK PENGELOLAAN DAN PERAWATAN ALAT BERAT
Preventive Maintenance Package (PMP)
merupakan program perawatan berkala alat berat yang bertujuan menjaga keandalan
unit dan mengurangi risiko kerusakan mendadak. Namun, efektivitas biaya dan
performa unit dengan penerapan PMP masih menjadi pertanyaan bagi sebagian
perusahaan. Penelitian ini bertujuan untuk menganalisis perbandingan biaya
perawatan dan performa unit bulldozer Komatsu berkapasitas 20 ton yang
menggunakan PMP dan yang tidak menggunakan PMP. Metode penelitian menggunakan
pendekatan kuantitatif komparatif melalui pengumpulan data dengan wawancara,
observasi lapangan, dan studi dokumen. Analisis performa dilakukan menggunakan
metode Overall Equipment Effectiveness (OEE) yang terdiri dari tiga
parameter, yaitu availability, utilization, dan productivity index. Hasil
penelitian menunjukkan bahwa biaya perawatan hingga 6.000 hours meter untuk
unit PMP sebesar Rp161.500.000 sedangkan unit tanpa PMP mencapai Rp171.529.000.
Dari sisi performa, nilai OEE unit dengan PMP sebesar 89,45?n unit tanpa PMP
hanya mencapai 69%. Kesimpulannya, penerapan PMP terbukti lebih efisien secara
biaya dan mampu meningkatkan efektivitas performa unit bulldozer dibandingkan
metode perawatan konvensional.
The Preventive Maintenance Package (PMP) is a periodic
maintenance program for heavy equipment aimed at maintaining unit reliability
and reducing the risk of sudden breakdowns. However, the cost-effectiveness and
performance of units using PMP remain a concern for some companies. This study
aims to analyze the comparison of maintenance costs and performance of 20-ton
Komatsu bulldozer units using PMP and those not using PMP. The research
employed a comparative quantitative approach with data collected through interviews,
field observations, and document studies. Performance analysis was conducted
using the Overall Equipment Effectiveness (OEE) method, which consists of three
parameters: availability, utilization, and productivity index. The results show
that maintenance costs up to 6,000 hours meter for units with PMP amounted to
IDR 161,500,000, while units without PMP reached IDR 171,529,000. In terms of
performance, the OEE value for units with PMP was 89.45%, whereas units without
PMP only achieved 69%. In conclusion, the implementation of PMP is proven to be
more cost-efficient and significantly improves bulldozer performance compared
to conventional maintenance methods.
Kata Kunci : Analisis Biaya, Bulldozer, Overall Equipment Effectiveness (OEE), Performa Unit, Preventive Maintenance Package (PMP)