Laporkan Masalah

Strategi Pemeliharaan Komponen Seal Pada Lifting Hydraulic Cylinder Unit Wheel Loader Komatsu WA800 Dengan Metode Reliability Centered Maintenance

An'amta Shobrin, Braam Delfian Prihadianto, S.T., M.Eng.

2025 | Tugas Akhir | D4 TEKNIK PENGELOLAAN DAN PERAWATAN ALAT BERAT

Pertambangan limestone milik PT. Indocement Tunggal Prakarsa menggunakan metode blasting atau peledakan, sehingga dibutuhkan wheel loader untuk memuat material yang sudah terpecah. Selama periode Januari 2023 hingga September 2024, wheel loader mengalami downtime sebesar 313,5 jam akibat kerusakan pada komponen lifting hydraulic cylinder, 91,23% kerusakan atau 286 jam di antaranya disebabkan oleh kerusakan seal kit.Tingginya kontribusi kerusakan seal terhadap downtime menunjukkan perlunya strategi pemeliharaan perencanaan penggantian komponen. Penelitian ini bertujuan untuk menganalisa strategi pemeliharaan yang tepat bedasarkan data kerusakan lifting hydraulic cylinder. Metode Reliability Centered Maintenance (RCM) digunakan dalam penelitian ini untuk menentukan strategi pemeliharaan yang tepat melalui pendekatan analisa kualitatif berupa Failure Mode and Effect Analysis (FMEA) yang dibantu dengan diagram pareto dan Logic Tree Analysis (LTA) serta analisa kuantitatif berupa perhitungan Mean Time to Failure (MTTF)  dan Mean Time to Repair (MTTR). Hasil FMEA dan diagram pareto pada penelitian ini menunjukkan kontaminasi partikel asing pada oli hidrolik menjadi penyebab dengan dampak terparah, dengan nilai RPN 280. Juga diketahui melaui analisa strategi perawatan sesuai dengan hasil LTA bahwa strategi pemeliharaan menggunakan pendekatan Predictive Testing and Inspection (PT&I) lebih efisien terhadap penggunaan suku cadang, waktu downtime, dan biaya tenaga kerja. Penelitian ini juga menghasikan strategi pemeliharaan yang lebih terencana.

The limestone mining of PT. Indocement Tunggal Prakarsa uses the blasting method, thus requiring a wheel loader to load the fragmented material. During the period from January 2023 to September 2024, the wheel loader experienced a total downtime of 313.5 hours due to damage to the lifting hydraulic cylinder component, with 91.23% or 286 hours of the damage caused by seal kit failure. The high contribution of seal damage to downtime indicates the need for a maintenance strategy for component replacement planning. This study aims to analyze the appropriate maintenance strategy based on the damage data of the lifting hydraulic cylinder. The Reliability Centered Maintenance (RCM) method is used in this study to determine the appropriate maintenance strategy through a qualitative approach in the form of Failure Mode and Effect Analysis (FMEA), assisted by a Pareto diagram and Logic Tree Analysis (LTA), as well as a quantitative analysis in the form of calculating the Mean Time to Failure (MTTF) and Mean Time to Repair (MTTR). The results of the FMEA and Pareto diagram in this study show that contamination of foreign particles in the hydraulic oil is the cause with the most severe impact, with an RPN value of 280. It is also known through the maintenance strategy analysis according to the LTA results that the maintenance strategy using the Predictive Testing and Inspection (PT&I) approach is more efficient in terms of spare part usage, downtime, and labor costs. This study also produces a more planned maintenance strategy.

Kata Kunci : Strategi Pemeliharaan, Reliability Centered Maintenance, Failure Mode and Effect Analysis, Wheel Loader

  1. D4-2025-483064-abstract.pdf  
  2. D4-2025-483064-bibliography.pdf  
  3. D4-2025-483064-tableofcontent.pdf  
  4. D4-2025-483064-title.pdf