Perencanaan sistem proteksi pembangkit listrik tenaga mikro hidro Siguntuk Desa Latuppa Kota Palopo Propinsi Sulawesi Selatan
USMAN, Andi, Ir. Hamzah Berahim, MT
2004 | Tesis | S2 Teknik Mesin (Magister Sistem Teknik)Sistem tenaga listrik dikatakan handal apabila sistem tersebut mampu menyediakan energi listrik secara terus menerus, tegangan stabil, frekwensi dan faktor daya yang baik. Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) sebagai suatu sistem tenaga listrik harus memenuhi faktor kehandalan dan keamanan. Faktor kemanan dan kehandalan dimaksud adalah aman terhadap manusia (konsumen) dan peralatan yang terpasang. Kehandalan dari penyaluran energi listrik sangat penting karena akan mempengaruhi kepercayaan terhadap PLTMH. Untuk memenuhi kebutuhan tersebut perlu mengetahui gangguan yang mungkin terjadi dan dengan segera dideteksi, disolir dari sistem oleh peralatan proteksi. Masalah gangguan harus menjadi prioritas utama pada sistem PLTMH dan cara pengamanan daerah gangguan tersebut agar tidak mempengaruhi bagian lain. Untuk mengatasi gangguan maka perlu dianalisa jenis gangguan yang mungkin terjadi pada jaringan distribusi dengan mengacu pada arus beban maksimum. Gangguan hubung singkat yang mengakibatkan arus listrik terbesar yang dijadikan pedoman/acuan dalam penentuan peralatan proteksi. Berdasarkan analisis gangguan hubung singkat maka gangguan hubung singkat tiga fasa yang dapat mengakibatkan arus hubung singkat terbesar, sehingga gangguan ini dijadikan acuan dalam penentuan peralatan proteksi. Dalam penentuan peralatan proteksi juga harus disesuaikan dengan peralatan dan jaringan terpasang. Sistem proteksi harus memenuhi persyaratan sensitivitas, kehandalan, selektivitas dan kecepatan, yang semuanya tergantung pada ketepatan penerapan pola proteksi dan pemilihan peralatan proteksi. Peralatan proteksi yang digunakan adalah Swicth fuse 31,5 A, PMT/Relay tipe VAR 82 D dan Recloser tipe ME. Koordinasi antara peralatan proteksi mulai dari hilir (konsumen) sampai hulu (sumber) dengan menggunakan waktu tunda 0,4 detik. Dengan demikian kontinuitas pelayanan energi listrik pada konsumen dapat terjamin.
Electrical power system is said reliable if the system could supply electrical power continuously, stable voltage, good frequency and power factor. Micro-Hydro Electrical Power Plants (Pembangkit Listrik Tenaga Mikro Hidro/PLTMH) as an electrical power system should fulfill reliability and safety factor. Its safety and reliability factor meant is that it was safe for human (consumers) and the equipment installed. The reliability from electrical power is very important because it will affect the trust toward PLTMH. To fulfill the need, it needs to know its disruption that may happen and with immediate detection it is from the system by protective equipment. Fault problem should be the major priority on the PLTMH system and the way of its safeguard of fault area so that it would not affect other parts. In order to overcome the problem it need an analysis on types of the disruption that might happen in the distribution network referred to maximum current electric. The short-circuit fault that results the highest electric current is made to be a reference in determining types of protective equipments. Based on the analysis on short-circuit current fault, the three-phase short-circuit current can cause the highest short-circuit current, so that the fault is made to be a reference in determining the protective equipment. In determining the protective equipment, it also must be in accordance with installed equipment and network. The protection system should fulfill the requirements of sensitivity, reliability, selectivity and speed, which all of those depend on the accuracy of protective pattern and choice of protective equipment. The protective equipments used are Switch fuse 31.5 A, PMT/Relay type VAR 82 D and Recloser type ME. The coordination between protective equipments started from consumers up to source using delay time 0,4 second. Thus, the continuity of service on electrical power to the consumers can be guaranteed.
Kata Kunci : Pembangkit Listrik Tenaga Mikrohidro,Perencanaan Sistem Proteksi, Electric Energy, Fault, Protection, Coordination