PERAMALAN BEBAN PT. PLN (PERSERO) ULP SRAGEN PENYULANG GARDU INDUK SRAGEN 150 KV DENGAN METODE TIME SERIES ANALYSIS LINEAR REGRESSION
Joseph Marshallva Milano Siahaan, Unan Yusmaniar Oktiawati, S.T., M.Sc., Ph.D.
2024 | Tugas Akhir | D4 TEKNOLOGI REKAYASA ELEKTRO
Indonesia ditargetkan menjadi negara maju pada
tahun emas Indonesia 2045. Kementerian PPN/Bappenas menyusun Rencana
Pembangunan Jangka Panjang Nasional 2025-2045 dalam mendukung pelaksanaan Visi
Indonesia Emas 2045. Penerapan Industri 4.0 akan memacu kinerja sektor industri
untuk mengakselerasi pemulihan ekonomi nasional. Ketersediaan energi listrik
mempunyai peran penting dalam penerapan Industri 4.0. PT. PLN (Persero)
dituntut selalu melakukan pengembangan sistem supaya tercapai stabilitas sistem
ketenagalistrikan. Peramalan beban
listrik dalam kurun waktu tertentu adalah dasar penting dalam perencanaan
pengembangan sistem ketenagalistrikan. Pada penelitian Proyek Akhir ini,
dilakukan peramalan beban menggunakan metode Time Series Analysis dan Linear
Regression di PT. PLN (Persero) ULP Sragen penyulang Gardu Induk Sragen 150
kV. Metode Time
Series Analysis digunakan untuk menentukan hasil peramalan jumlah penduduk
pada tahun 2045 menurut urutan waktu kejadian. Berdasarkan hasil peramalan tahun
2045, peningkatan jumlah penduduk tertinggi terjadi pada Kecamatan Karangmalang
sebesar 24,83?ri jumlah penduduk tahun 2022. Metode Time Series Analysis
mendapatkan Mean Absolute Percentage Error (MAPE) sebesar 0,49% s/d
3,93?ngan kategori “Sangat baik”. Metode Linear Regression digunakan
untuk menentukan hasil peramalan beban penyulang tahun 2045 menurut hasil
peramalan jumlah penduduk. Berdasarkan hasil peramalan beban penyulang tahun
2045, peningkatan beban tertinggi terjadi pada penyulang SRN-5 sebesar 24,83?ri beban tahun 2022. Metode Linear Regression mendapatkan Mean Absolute
Percentage Error (MAPE) sebesar 5,19% s/d 9,42?ngan kategori “Sangat
baik”.
Indonesia is targeted to become a developed country in
Indonesia's golden year 2045. The Ministry of National Development Planning of
the Republic of Indonesia prepares the National Long-Term Development Plan
2025-2045 to support the implementation of the Golden Indonesia Vision 2045.
The application of Industry 4.0 will spur the performance of the industrial
sector to accelerate national economic recovery. The availability of electrical
energy has an important role in the application of Industry 4.0. PT. PLN
(Persero) is required to always develop the system to achieve electricity
system stability. The electrical load forecasting within a certain period of
time is an important basis in planning the development of the electricity
system. In this Final Project research, load forecasting was carried out using
Time Series Analysis and Linear Regression methods at Sragen Substation 150 kV
feeders of PT. PLN (Persero) ULP Sragen. The Time Series Analysis method is
used to determine the results of population forecasting in 2045 according to
the time sequence of events. Based on the results of the 2045 forecast, the
highest population increase occurred in Karangmalang District by 24.83% of the
total population in 2022. The Time Series Analysis method gets a Mean Absolute
Percentage Error (MAPE) of 0.49% to 3.93% with the "Very good"
category. The Linear Regression method is used to determine the results of load
forecasting of the feeders in 2045 according to the results of population
forecasting. Based on the results of the 2045 feeders load forecast, the
highest load increase occurred in the SRN-5 feeder by 24.83% of the 2022 load.
The Linear Regression method gets a Mean Absolute Percentage Error (MAPE) of
5.19% to 9.42% with the "Very good" category.
Kata Kunci : Peramalan Beban, Penyulang, Time Series Analysis, Linear Regression, Mean Absolute Percentage Error