Tugas akhir ini dilatarbelakangi oleh salah
satunya yaitu kompleksitas metode prefabrikasi yang digunakan untuk metode
konstruksi jembatan. Kompleksitas ini berupa proses konstruksi yang rumit mulai
dari transportasi material, mobilisasi alat berat, dan perakitan serta
pemasangan rangka jembatan, sehingga diperlukan sebuah tindakan untuk mengatasi
kompleksitas tersebut. Perancangan ini bertujuan untuk mengetahui keamanan dari
pemasangan rangka jembatan, mengusulkan BIM Execution Plan (BEP), dan mengetahui
analisis emisi pada proses konstruksi.
Perhitungan analisis struktur dilakukan
menggunakan perangkat lunak midas Civil dengan konsep finite element
method (FEM), analisis dilakukan terhadap lifting lug ketika rangka
jembatan sedang dalam proses pemasangan. Hasil dari analisis ini adalah nilai stress
yang terjadi pada lifting lug, hasil analisis akan divalidasi dengan
hasil analisis milik subkontraktor. Dalam merancang BEP, yang pertama dilakukan
adalah mengidentifikasi dan menganalisis penggunaan BIM berdasarkan tujuan
proyek dalam suatu pekerjaan, setelah itu akan dilakukan desain proses BIM
dengan metode trial and error menggunakan perangkat lunak Autodesk
Revit untuk menghasilkan lifting plan pada pekerjaan pemasangan
rangka jembatan. Untuk analisis emisi, akan dilakukan perhitungan nilai Greenhouse
Gases (GHG) Emission dan Global Warming Potential (GWP) pada
pekerjaan pemasangan rangka jembatan.
Hasil dari analisis struktur yang dilakukan
menghasilkan nilai stress maksimal pada lifting lug sebesar
133,93 MPa, dengan material lifting lug yaitu SM490YA yang memiliki
nilai tegangan leleh (fy) sebesar 345 MPa, dapat diketahui
bahwa nilai stress yang dialami lifting lug masih dalam batas
kekuatan dengan safety factor sebesar 2,5. Pada implementasi BIM, BEP
yang dihasilkan mencakup lifting plan, identifikasi potensi konflik,
simulasi proses pemasangan rangka jembatan, dan visualisasi 3D konstruksi. Untuk
analisis emisi, didapat nilai total GHG Emission untuk CO2
sebesar 10.946,8 kg, CH4 sebesar 0,57615 kg, dan N2O
sebesar 0,57615 kg. Untuk nilai GWP yang dihasilkan oleh pekerjaan pemasangan
rangka jembatan yaitu sebesar 11.115,27 kgCO2eq.
This final project is motivated by various factors, one of which is the
complexity of the prefabrication method used for bridge construction. This
complexity involves a complex construction process that starts with material
transportation, mobilization of heavy equipment, and the assembly and
installation of the bridge framework. Thus, an action is required to address
this complexity. The objective of this design is to assess the safety of the
bridge framework installation, propose a BIM Execution Plan (BEP), and to
assess emission calculation of the construction process.
Structural analysis calculations are performed using the midas Civil
software with the concept of the finite element method (FEM). The analysis is
focused on the lifting lug while the bridge framework is in the process of
being installed. The outcome of this analysis is the stress value that occurs
on the lifting lug, and the analysis results will be validated against those of
the subcontractor's analysis. In designing the BEP, the first step is to
identify and analyze the usage of Building Information Modeling (BIM) based on
the project's objectives. Subsequently, the BIM process will be designed using
a trial and error method with Autodesk Revit software to generate a lifting
plan for the bridge framework installation. For emissions analysis,
calculations will be conducted to determine the values of Greenhouse Gas (GHG)
Emission and Global Warming Potential (GWP) during the bridge framework
installation.
The results of the structural analysis reveal that the maximum stress on
the lifting lug is 133.93 MPa, with the lifting lug material being SM490YA,
which has a yield strength (fy) value of 345 MPa. It can be noted that the
stress experienced by the lifting lug is still within the strength limits with
a safety factor of 2.5. In the implementation of BIM, the resulting BEP
includes the lifting plan, identification of potential conflicts, simulation of
the bridge framework installation process, and 3D construction visualization. For
the emissions analysis, the total values of GHG Emission are 10,946.8 kg for CO2,
0.57615 kg for CH4 (methane), and 0.57615 kg for N2O
(nitrous oxide). The GWP value resulting from the bridge framework installation
work is 11,115.27 kgCO2eq
Kata Kunci : Finite Element Method, BIM, BIM Execution Plan, Lifting Plan, Emisi