ANALISIS PRODUKTIVITAS BATCHING PLANT PADA PRODUKSI BETON (STUDI KASUS : BATCHING PLANT PT ADHI PERSADHA BETON SEYEGAN PROYEK TOL JOGJA-BAWEN)
Avico Ardi Prasetya, Dian Sestining Ayu, S.T., M.T.
2023 | Tugas Akhir | D4 TEKNIK PENGELOLAAN DAN PEMELIHARAAN INFRASTRUKTUR SIPIL
Pada berbagai pekerjaan strulktulr dalam sulatul proyek terdapat pulla
pekerjaan pembetonan ataul pengecoran sulatul konstrulksi. Pada proyek Jalan Tol
Jogja-Bawen ini pekerjaan pembetonan adalah pekerjaan yang memiliki volulme
paling besar diantara sulb pekerjaan lainnya. Akan tetapi wlaulpuln memiliki volulme
paling besar terkadang terdapat beberapa kendala seperti permintaan lapangan yang
tak pasti dan kerulsakan alat yang menghambat proses produlksi. Penelitian ini
bertujuan ulntulk menganalisis prosedulr pelaksanaan produlksi beton, Menganalisis
kapasitas produlksi beton harian di Batching Plant, Menganalisis faktor-faktor yang
mempengarulhi proses produlksi beton pada Batching Plant, dan Menganalisis
evektivitas dan produlktivitas alat berat yang digulnakan pada Batching Plant
Penelitian ini menggulnakan metode kulantitatif dengan pendekatan Man and
Machine Process Chart dan Overall Equlipment Effectiveness (OEE). Data yang
digulnakan diperoleh dari hasil pengamatan langsulng ketika di lokasi pengamatan
selama pelaksanaan magang. Pengamatan dalam kasuls ini berfokuls pada Cycle
Time dari alat berat yang ada (wheel loader, batching plant, trulck mixer) dengan
menghitulng cakulpan waktul dari sulatul kegiatan yang dilakulkan alat berat dan data
waktul kerja tidak evektivitas mesin batching plan saat produlksi berlangsulng.
Hasil penelitian ini menulnjulkan Kapasitas produlksi harian aktulal Batching
Plant Seyegan periode bullan Maret 2023 sebesar 328 m³ ataul 48?ri kapasitas
produlksi optimal sebesar 684 m³ /hari, Produlktivitas wheel loader dalam memulat
agregat haluls 75,23 m³/jam, dan agregat kasar sebesar 80,68m³/jam, Cycle Time
Rata-Rata Trulck Mixer adalah selama 70 menit ataul 1,2 jam. Nilai OEE Mesin
Batching Plant tidak ideal yaitul 80,90%. Selisih antara OEE Mesin Batching Plant
dengan OEE world class adalah 3,10 %, performance efficiency memberikan
kontribulsi paling besar pada rendahnya nilai OEE yaitul 85,10%. performance
efficiency yang rendah menulnjulkkan banyaknya jeda ataulpuln waktul yang terbulang
sia-sia ketika produlksi berjalan. Sedangkan faktor faktor yang mempengarulhi
produlksi beton pada batching plant seyegan adalah julmlah permintaan beton dari
lapangan, jadwal produlksi, jadwal material, kondisi mesin, lingkulngan, sulmber
daya manulsia, kulalitas bahan bakul, kondisi culaca, ketersediaaan Trulck Mixer, dan
Traffic Management.
In various structural works in a project there are also concrete or casting
works in a construction. In the Jogja-Bawen Toll Road project, the concrete work
is the work that has the largest volume among the other sub-works. However, even
though it has the largest volume, sometimes there are several obstacles such as
uncertain field demands and equipment damage that hinders the production
process. The purpose of this study is to analyze the procedures for carrying out
concrete production, analyze the daily concrete production capacity in the batching
plant, analyze the factors that influence the concrete production process in the
batching plant, and analyze the effectiveness and productivity of the heavy
equipment used in the batching plant.
This research uses quantitative methods with the approach of Man and
Machine Process Chart and Overall Equipment Effectiveness (OEE). The data used
was obtained from direct observation at the observation site during the internship.
Observations in this case focused on the Cycle Time of existing heavy equipment
(wheel loaders, batching plants, truck mixers) by calculating the time coverage of
an activity carried out by heavy equipment and data on the ineffective working time
of the batching plan machine during production.
The results of this study show that the actual daily production capacity of
the Seyegan Batching Plant for the period March 2023 is 328 m³ or 48% of the
optimal production capacity of 684 m³/day, the productivity of the wheel loader in
loading fine aggregate is 75.23 m³/hour, and the coarse aggregate is 80 ,68m³/hour,
the Average Cycle Time of the Mixer Truck is 70 minutes or 1.2 hours. The OEE
value of the Batching Plant Machine is not ideal, namely 80.90%. The difference
between OEE Batching Plant Machinery and OEE world class is 3.10%,
performance efficiency contributes the most to the low OEE value of 85.10%. Low
performance efficiency indicates a lot of lag or wasted time when production is
running. Meanwhile, the factors that affect concrete production in batching plants
are the number of requests for concrete from the field, production schedules,
material schedules, machine conditions, environment, human resources, quality of
raw materials, weather conditions, availability of Mixer Trucks, and Traffic
Management.
Kata Kunci : Batching Plant, Produktivitiy, Evektivity, Man and Machine Process Chart, Overall Equipment Effectiveness, Production