Pada pembangkit listrik tenaga
panas bumi (PLTP) PT. Geo Dipa Energi (Persero) Unit Dieng, sistem proteksi
kelistrikan dibutuhkan dalam menjaga keandalan dan kontinuitas pembangkit untuk
menyalurkan listrik dalam sistem interkoneksi Jawa, Madura, dan Bali. Setiap peralatan pada sistem proteksi
memiliki setting dan waktu kerja masing-masing menyesuaikan daerah yang
diproteksi dan gangguan yang terjadi. Penelitian ini membahas tentang analisa
studi dan evaluasi koordinasi proteksi pada switchgear 19 KV PLTP Unit 1
PT. Geo Dipa Energi (Persero) Unit Dieng. Analisa studi dilakukan dengan
melakukan perhitungan setting
dan simulasi hubung singkat pada kondisi existing berdasarkan data hasil pengujian. Tujuan analisa studi adalah untuk memastikan kesesuaian setting existing dengan standar dan prinsip koordinasi.
Kemudian akan dilakukan evaluasi terkait kinerja peralatan sistem proteksi
berdasarkan hasil analisa studi dengan resetting menggunakan perhitungan
teori. Berdasarkan hasil analisa studi, diketahui bahwa relai frekuensi,
tegangan, dan daya balik masih beroperasi dengan layak karena memenuhi standar.
Sementara itu, diketahui jika setting existing pada relai arus
lebih masih belum memenuhi standar sehingga perlu dilakukan resetting. Resetting
pada relai arus lebih meliputi penentuan setting arus pickup, instanenous,
dan time dial supaya grading time antar peralatan sistem proteksi
memenuhi standar IEEE 242, yaitu 0,2 - 0,4 detik.
At the
Geothermal Power Plant (PLTP) of PT. Geo Dipa Energi (Persero) Unit Dieng, an
electrical protection system is necessary to maintain the reliability and
continuity of the generator in delivering electricity within the interconnected
system of Java, Madura, and Bali. Each equipment in the protection system has
its own settings and operating time, tailored to the protected area and the
occurring disturbances. This study discusses the analysis, study, and
evaluation of protection coordination in the 19 kV switchgear of Unit 1 at PT.
Geo Dipa Energi (Persero) Unit Dieng. The study analysis is conducted by
performing setting calculations and short-circuit simulation based on the
existing conditions using the test data. The objective of the study analysis is
to ensure the conformity of the existing settings with the standards and
coordination principles. Subsequently, an evaluation of the performance of the protection system
equipment will be conducted based on the results of the study analysis, with resetting
using theoretical calculations. Based on the study analysis results, it is
found that the frequency, voltage, and reverse power relays are still operating
properly as they meet the standards. However, it is identified that the
existing settings for the overcurrent relay do not yet comply with the
standards and therefore require resetting. The resetting of the overcurrent relai includes determining the pickup current, instantaneous, and time
dial settings to ensure the grading time between the protection system
equipment meets the IEEE 242 standard, which is 0.2 - 0.4 seconds.
Kata Kunci : Kata kunci : Sistem proteksi, koordinasi proteksi, arus hubung singkat, stabilitas transient, relai pengaman.