<xml> </xml><![endif]--><!--[if gte mso 9]><xml> Normal 0 false false false EN-US X-NONE X-NONE </xml><![endif]--><!--[if gte mso 9]><xml> </xml><![endif]--><!--[if gte mso 10]> <style> /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:8.0pt; mso-para-margin-left:0in; line-height:107%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi; mso-font-kerning:1.0pt; mso-ligatures:standardcontextual;} </style> <![endif]-->Medium voltage maneuvers are a series of medium-voltage network manipulation activities involving two or more feeders with the aim of minimizing blackouts due to disturbances by paying attention to power losses in the network. In maneuvering the network, the selection of the lowest power loss aims to minimize losses and get maximum distribution. The PWO2 Purworejo feeder with a total load of 145.1A had a power failure, so a blackout was needed. The disturbance that occurs in section A with an average fault current of 0.8 A. This requires a backup system of 144.34 A with a total active power loss of 0.11578 MW or 2.42%. The PWO5 feeder has a load current of 148.97 A with an active power loss of 0.11381 MW or 2.27%. The PWO11 feeder has a total load of 204 A with an active power loss of 0.47158MW or 7.21%. The PWO5 feeder is used as the main option for network maneuvers from the PWO2 feeder for load sharing because it has the lowest power loss and the feeder load current is smaller than PWO11. The total load current after network maneuvers is 293.67 A with an increase in power loss percentage of 7.7%. The level of Energy Not Supplied (ENS) at the time of power failure fell from 13,493.67 kWh to 77.64 kWh. The total loss if the blackout without network maneuvers costs a total loss of Rp. 20,067,464.3, while with network maneuvers the total loss costs Rp. 3,360,688.26 or decreases by 83.25%. "> <xml> </xml><![endif]--><!--[if gte mso 9]><xml> Normal 0 false false false EN-US X-NONE X-NONE </xml><![endif]--><!--[if gte mso 9]><xml> </xml><![endif]--><!--[if gte mso 10]> <style> /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:8.0pt; mso-para-margin-left:0in; line-height:107%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi; mso-font-kerning:1.0pt; mso-ligatures:standardcontextual;} </style> <![endif]-->Medium voltage maneuvers are a series of medium-voltage network manipulation activities involving two or more feeders with the aim of minimizing blackouts due to disturbances by paying attention to power losses in the network. In maneuvering the network, the selection of the lowest power loss aims to minimize losses and get maximum distribution. The PWO2 Purworejo feeder with a total load of 145.1A had a power failure, so a blackout was needed. The disturbance that occurs in section A with an average fault current of 0.8 A. This requires a backup system of 144.34 A with a total active power loss of 0.11578 MW or 2.42%. The PWO5 feeder has a load current of 148.97 A with an active power loss of 0.11381 MW or 2.27%. The PWO11 feeder has a total load of 204 A with an active power loss of 0.47158MW or 7.21%. The PWO5 feeder is used as the main option for network maneuvers from the PWO2 feeder for load sharing because it has the lowest power loss and the feeder load current is smaller than PWO11. The total load current after network maneuvers is 293.67 A with an increase in power loss percentage of 7.7%. The level of Energy Not Supplied (ENS) at the time of power failure fell from 13,493.67 kWh to 77.64 kWh. The total loss if the blackout without network maneuvers costs a total loss of Rp. 20,067,464.3, while with network maneuvers the total loss costs Rp. 3,360,688.26 or decreases by 83.25%. ">
ANALISIS NILAI BEBAN DAN SUSUT DAYA TERENDAH SEBAGAI SKEMA OPSI PENENTUAN MANUVER JARINGAN DISTRIBUSI 20kV PENYULANG PWO-2 PT. PLN (PERSERO) UNIT LAYANAN PELANGGAN (ULP) PURWOREJO
Burhanuddin Wafiq, Dr. Eng. Tika Erna Putri, S.Si., M.Sc.
2023 | Tugas Akhir | D4 TEKNOLOGI REKAYASA ELEKTRO
<!--[if gte mso 9]><xml>
<!--[if gte mso 9]><xml>
Kata Kunci : Manuver, Penyulang, Jaringan Distribusi, Susut daya, ENS