Laporkan Masalah

ANALISIS LAPISAN PENUTUP LAPANGAN TAMBANG ANDESIT, KOKAP, KULON PROGO DENGAN MENGGUNKAN METODE GEOLISTRIK KONFIGURASI DIPOLE-DIPOLE

LILIK MARYANTO, Dr. Wahyudi, M.S.

2021 | Skripsi | S1 GEOFISIKA

INTISARI ANALISIS LAPISAN PENUTUP LAPANGAN TAMBANG ANDESIT, KOKAP, KULON PROGO DENGAN MENGGUNKAN METODE GEOLISTRIK KONFIGURASI DIPOLE-DIPOLE Lilik Maryanto 14/365963/PA/16168 Andesit merupakan batuan yang bagus untuk material kontruksi bangunan. Semakin banyak pembangunan infrastruktur mengakibatkan kebutuhan material andesit juga semikin meningkat. Aktivitas penambangan andesit harus memperhatikan dalam proses pengupasan lapisan overburden sebagai salah satu tahapan yang sangat mempengaruhi dalam kegiatan pertambangan terbuka karena semakin tinggi produktvitas dan jam kerja pada kegiatan pengupasan overburden maka produksi deposit akan semakin tinggi. Analisis lapisan overburden sangat diperlukan untuk memberikan informasi terkait karakeristik dan sebarannya, sehingga penambangan andesit dapat dilakukan dengan efisien. Survei geolistrik di Wilayah Izin Usaha Pertambangan (WIUP) yang berlokasi di Desa Kalirejo dan Hargorejo, Kecamatan Kokap, Kabupaten Kulon Progo, Daerah Istimewa Yogyakarta dilakukan dengan menggunakan metode geolistrik konfigurasi Dipole-Dipole dengan tujuan untuk menganalisis sebaran lapisan overburden. Lapisan overburden di daerah survei dari atas kebawah terdiri dari perlapisan top soil dengan resistivitas sebesar (20-100) ohm.meter dan Andesit lapuk (weathered bedrock) dengan resistivitas sebesar (101-220) ohm.meter. Sebaran lapisan overburden berdasarkan ketebalannya diklasifikaskan menjadi tiga ketebalan lapisan, yang pertama adalah lapisan overburden tebal pada interval 30-46 meter tersebar di bagian tengah daerah survei, yang kedua adalah lapisan overburden sedang pada interval 18-23 meter tersebar di bagian Utara, Timur, dan Selatan, serta lapisan overburden kecil pada interval 1-17 meter tersebar pada bagian Barat daerah survei. Kata kunci : Dipole-dipole, Overburden, top soil, andesit lapuk, andesit segar

ABSTRACT OVERBURDEN ANALYSIS AT ANDESITE MINE FIELD, KOKAP, KULON PROGO USING GEOELECTRICAL DIPOLE-DIPOLE CONFIGURATION METHOD Lilik Maryanto 14/365963/PA/16168 Andesite is good rock as a building contruction material. The increasing number of infrastructure developments lead to a higher demand of andesite material. The andesit mining activitiy must pay attention to the stripping of the overburden layer as one of the most important stage in open pit mining activities because if the productivity and working hours of the overburden stripping activity are getting higher, the production of deposits will increase. Analysis of the overburden layer is needed to provide information related to its characteristics and distribution, so that the andesite mining can be carried out efficiently. The geoelectric survey in the Mining Business License Area (WIUP), located in Kalirejo and Hargorejo Villages, Kokap District, Kulon Progo Regency, Yogyakarta Special Region were held using the geoelectric method with a dipole-dipole configuration with the aim of analyzing the distribution of the overburden layer. The overburden layer in the survey area from top to bottom is a top soil layer with a resistivity of (20-100) Ωm and weathered andesite with a resistivity of (101-220) ohm.meter. The distribution of the overburden layer based on its thickness is classified into three layer thickness, the first is a large overburden layer thickness at 30-46 meter intervals are scattered in the center of the survey area, the second is a medium overburden layer thickness at 18-23 meter intervals are scattered in the North, East and South, and the last is a small overburden layer thickness at 1-17 meter intervals are scattered in the western of the survey area. Keywords : Dipole-dipole, Overburden, top soil, weathered andesite, fresh andesite

Kata Kunci : Dipole-dipole, Overburden, top soil, andesit lapuk, andesit segar

  1. S1-2021-365963-abstract.pdf  
  2. S1-2021-365963-bibliography.pdf  
  3. S1-2021-365963-tableofcontent.pdf  
  4. S1-2021-365963-title.pdf