PENENTUAN TITIK LETAK DAN SETTING RECLOSER PADA PENYULANG BARU PANDAEN LAMPER 15
ERI TRIANA, Dhanis Woro Fittrin S.N.G, S.T., M.Eng.
2018 | Tugas Akhir | D3 TEKNOLOGI LISTRIKPenyaluran energi listrik untuk pelanggan melewati 3 komponen utama yaitu pembangkitan, transmisi dan distribusi. Tahap ditribusi berawal dari Gardu Induk. Gardu induk pandaen lamper terdiri dari 3 trafo. Salah satunya trafo 3 (60 MVA) yang terdiri dari 7 penyulang operasi dan 1 cadangan. Kapastitas trafo 3 yaitu 1732 A. Pada trafo 3 Pandean Lamper memiliki beban >1000 A sedangkan trafo 1 dan 2 pandean lamper < 1000 A. Salah satu penyulang trafo 3 yaitu PDL-09 memiliki beban puncak di bulan Maret 396 A melebihi nilai standar normal kesepaktan PT.PLN APD JATENG dan DIY yaitu 250 A. Oleh karena itu, diperlukan adanya penyulang baru untuk memecah beban PDL-09 sehingga mengurangi beban trafo 3 dan penyulang PDL-09. Penyulang baru yang diusulkan dipasang pada trafo 2 yaitu penyulang PDL-15. Daerah yang akan disuplai oleh PDL-15 dengan memecah beban PDL-09 dan PDL-02 telah terjadi beberapa gangguan. Sehingga diperlukan peralatan proteksi recloser. Adanya recloser maka PMT outgoing tidak langsung trip bila terjadi gangguan setelah recloser dan daerah padam dapat diminimalisir. Pemasangan recloser disuatu penyulang membutuhkan perhitungan jarak recloser dan setting yang tepat agar recloser dan PMT outgoing saling berkoordinasi.
The allocation of electricity for costumers goes by three main components. They are generation, transmission, and distribution. The distribution starts from Gardu Induk (substation). Meanwhile, the Gardu Induk in Pandean Lamper has three transformators. One of them is transformator 3 (60 MVA) with seven working feeders and one express feeder. The capacity of transformator 3 is 1732 A. It has load of > 1000 A. On the other hand, the load for transformator 1 and 2 are < 1000 A. Meanwhile, the peak load of PDL-09, one of the feeders of transformator 3, was 396 A in March. It surpassed the standard by PT PLN APD JATENG dan DIY, which is 250 A. Therefore, a new feeder was needed to solve the matter and to reduce the load of transformator 3 and the feeder PDL-09. The new feeder was installed in transformator 2 as PDL-15. It broke the load of PDL-09 and also PDL-02. However, the supplied area experienced some problems. Thus, protection gear recloser was necessary. With recloser, PMT outgoing would not trip immediately in case a problem happened after recloser. Moreover, the black-out would be minimized. The installation of recloser in a feeder needed a measurement of the recloser distance and a precise setting. If so, the recloser and PMT outgoing would coordinate.
Kata Kunci : penyulang baru, PMT outgoing, recloser, setting koordinasi