Tinjauan Koordinasi Sistem Proteksi Pada Sistem Kelistrikan Pabrik 1A PT Pupuk Kalimantan Timur (PKT)
DUWINDA FERRY S, Harnoko St., Ir., M.T.; Tiyono, Ir., M.T.
2018 | Skripsi | S1 TEKNIK ELEKTROKeandalan sistem kelistrikan serta kontinuitas suplai daya listrik sangat diperlukan untuk mendukung proses produksi pada industri. Salah satu faktor yang mempengaruhi keandalan sistem kelistrikan yaitu performa sistem proteksi. Sistem proteksi yang handal memerlukan perhitungan koordinasi rele arus lebih dan rele gangguan tanah yang tepat sehingga rele dapat mengisolasi daerah gangguan secara cepat, selektif, dan sensitif guna mencegah terjadinya pemadaman di daerah lain. Tugas akhir ini diawali dengan pengumpulan data pada unit produksi eks-KPA, Pabrik 1A, PT Pupuk Kalimantan Timur. Pemodelan single line diagram dibuat menggunakan software ETAP 12.6. Hasil simulasi hubung singkat menjadi acuan dalam menentukan setting rele proteksi. Tiga tipikal koordinasi ditentukan untuk mewakili kinerja koordinasi rele arus lebih yang terpasang. Hasil analisis dari ketiga tipikal koordinasi ditemukan beberapa setting rele yang kurang tepat. Setting time dial rele arus lebih R-TRH-1 sebesar 50, menyebabkan overlapping kerja dari rele OCR_01 KPA sebagai pengaman backup saat terjadi gangguan hubung singkat 3 fase (5,71 kA) pada trafo. Hal tersebut menyebakan seluruh bus pada unit kerja padam. Rekomendasi setting yang baru dapat digunakan sebagai masukan untuk perbaikan sistem proteksi unit produksi eks-KPA, Pabrik 1A, PT Pupuk Kalimantan Timur.
The reliability of the electrical system as well as the continuity of electrical power supply is needed to support the production process in industrial company. One of the factors that affect the reliability of the electrical system is the performance of the protection system. Reliable protection system required the calculation of overcurrent and ground fault relay coordination precisely so relay can quickly isolate the disturbance area quickly, selective, and sensitive in order to prevent damaging other areas. This final project begins with collecting data in ex-KPA, production unit of 1A plant, PT Pupuk Kalimantan Timur. Modeling of single line diagram use ETAP 12.6 software. The simulation results of short circuit becomes a reference in determining the protection relay settings. Three typical coordination is determined to represent the performance of the coordination of overcurrent relay sinstalled. Analysis results of the three typical coordination found some errors setting of relays installed. Time dial setting of overcurrent relay R-TRH-1 was 50, it induce overlapping trip from OCR_01 KPA relay as a backup relay when a 3 phase short circuit (5,71 kA) occurs on the transformer. It causes entire production unit bus outage. The new recommendations setting can be considered for the improvement of the protection system in ex-KPA, production unit of 1A plant, PT Pupuk Kalimantan Timur.
Kata Kunci : koordinasi, proteksi, rele arus lebih, rele gangguan tanah/coordination, protection, overcurrent relay, ground fault relay