Laporkan Masalah

Analisis Perbandingan Hasil Timbang Timbangan Ban Berjalan dengan Timbangan Jembatan di Dump Hopper 3 Banko Barat PT. Bukit Asam (Persero) Tbk.

MEIKA CLARA, Agus Trihantoro, M.T

2017 | Tugas Akhir | D3 METROLOGI DAN INSTRUMENTASI SV

PT. Bukit Asam (Persero) Tbk. memiliki kontrak dengan 4 kontraktor untuk melakukan proses penambangan batubara di pit Banko Barat, Tanjung Enim Sumatera Selatan. Pembayaran hasil kepada kontraktor dilakukan dengan membayar hasil timbang batubara yang telah diangkut oleh dump truck dari front ke stockpile ataupun ke total loading station (TLS). Penimbangan batubara dilakukan dengan timbangan jembatan (dump truck scale) dan divalidasi dengan timbangan ban berjalan (conveyor belt scale). Namun hasil timbang antara kedua alat ini memiliki selisih yang jauh sehingga dapat merugikan perusahaan karena pembayaran yang tidak sesuai dengan hasil kerja kontraktor. Tujuan dari penelitian ini adalah mengetahui penyebab perbedaan hasil ukur antara timbangan jembatan dengan timbangan ban berjalan secara metrologi dan memberikan evaluasi kepada perusahaan terkait penggunaan alat tersebut. Pengambilan data dilakukan secara langsung dengan mengamati hasil timbang yang tertera pada indikator kedua alat ukur. Metode pengolahan data dilakukan dengan software Microsof Excel dan SPSS . Berdasarkan analisis yang telah dilakukan diperoleh tingkat presisi conveyor belt scale 1 adalah 99.95% dengan tingkat akurasi 84.57% sementara tingkat presisi conveyor belt scale 2 adalah 99.89% dengan tingkat akurasi 71.87%. Nilai standar deviasi dari conveyor belt scale 1 sebesar 2.4% dan nilai standar deviasi conveyor belt scale 2 sebesar 5.2%. Nilai standar deviasi dari dump truck scale sebesar 21.8kg.

PT. Bukit Asam (Persero) Tbk. has contracted with four contractors to carry out the process of pit coal mining in Banko Barat, Tanjung Enim in South Sumatera. Payments to the contractor results done by paying weigh the results of coal was transported by dump truck from front to stockpile or to the total loading station (TLS). Weighing scales of coal carried by the bridge (dump truck scale) and validated scales conveyor belt (conveyor belt scale). However, the results weigh between these two tools have much difference that can hurt the company because payments are not in accordance with the contractor's work. The purpose of this research is to know the cause of differences in results between the scales measuring bridge with conveyor belt scales in metrology and provide an evaluation to companies related to the use of these tools. Data is collected directly by observing the results of weighing indicated on the second indicator measuring instruments. Methods of data processing is done with Microsof Excel software. and SPSS. Based on the analysis that has been done obtained the degree of precision conveyor belt scale 1 is 99.95% with an accuracy rate of 84.57% while the level of precision conveyor belt scale 2 was 99.89% with 71.87% accuracy rate. Standard deviation of the conveyor belt scale 1 of 2.4% and a standard deviation value scale conveyor belt 2 by 5.2%. Standard deviation of the dump truck scales at 21.8kg.

Kata Kunci : conveyor belt scale, dump truck scale, mining


    Tidak tersedia file untuk ditampilkan ke publik.