Laporkan Masalah

TINGKAT KEPENTINGAN DAN PENERAPAN SISTEM MANAJEMEN MUTU PELAKSANAAN PEKERJAAN TANAH PADA JALAN PROVINSI (STUDI KASUS JALAN PROVINSI DI PROVINSI JAMBI)

DORI NOVI POSILAMA, Prof. Dr. Ir. Agus Taufik Mulyono, M.T. ; Prof. Dr.Tech. Ir. Danang Parikesit, M.Sc

2018 | Tesis | Magister Sistem dan Teknik Transportasi

Penerapan SMM pada pelaksanaan proyek jalan sangat penting agar hasil kegiatan dapat mencapai sasaran mutu yang direncanakan Permasalahan utama perkerasan jalan di Indonesia umumnya terjadi kerusakan sebelum masa akhir rencana umur jalan, Provinsi Jambi juga tidak terlepas dari permasalahan tersebut. Fakta di lapangan kerusakan jalan disebabkan oleh perilaku kontraktor yang tidak patuh terhadap spesifikasi bina marga revisi 2010. Instruksi kerja yang disusun secara sistematis sebagai panduan pengawasan proyek jalan khususnya pekerjaan tanah. Penelitian ini bertujuan untuk memetakan penerapan SMM, kontribusi komponen dan sub komponen terhadapan capaian kinerja , membuat metode penilaian capaian mutu pada pelaksanaan pekerjaan tanah, salah satunya adalah pekerjaan timbunan pilihan. Penelitian di lakukan dengan mengumpulkan data melalui survei kuesioner terhadap pihak-pihak yang terlibat langsung pelaksanaan jalan provinsi di Provinsi Jambi yaitu; PPK, kontraktor, dan konsultan pengawas. Tahap pertama analisis kuadran dari hasil survei tingkat kepentingan dan tingkat penerapan SMM komponen pekerjaan timbunan pilihan menggunakan metode IPA Selanjutnya melakukan analisis SEM dari hasil survei tingkat kepentingan komponen pekerjaan timbunan pilihan. Hasil penelitian menunjukkan bahwa komponen pekerjaan timbunan pilihan masih ada sub komponen yang menjadi skala prioritas penerapan di lapangan harus sesuai standar . Kontribusi pengaruh terhadap capaian kinerja pekerjaan timbunan pilihan sub komponen pemadatan material 86%; sub komponen penghamparan material 82%; dan sub komponen persiapan 71%. Impelementasi penilaian kinerja mutu pada proyek konstruksi jalan di Provinsi Jambi yang menghasilkan nilai sebesar 82,30% dan termasuk kategori medium.

Implementation of Quality Management Standart very important on road project implementation so that the results of the activities can achieve the planned quality objectives. The main problem of pavement in Indonesia is generally damage before the end of life plan, Province Jambi also can not be separated from the problem. The facts in the field of road damage are caused by the behavior of contractors who are not adherent to the 2010 revision clan specification. The work instructions are systematically arranged as a guide for the supervision of road projects, especially land works. This study aims to determine the mapping of (IQM) implementation, the contribution of components and sub components to the achievement of quality, making the method of quality achievement assessment on the implementation of soil work, one of which is the choice of heap work. Research done by collecting data through questionnaire survey to the parties directly involved the implementation of provincial roads in Jambi , namely; PPK, contractors, and supervisory consultants. The first stage of mapping analysis of the interest rate survey and the level of (IQM) implementation of preferred stockpile components using the IPA method Furthermore, SEM analyzes the survey results of the importance level of the preferred stockpile component. The result of the research shows that there is still a sub component component that becomes the priority scale of application in the field must be standard. Contribution of influence to the quality performance of the preferred choice of material composite substrate 86%; 82% material overlay sub component; and 71% preparation sub component. Impelementasi assessment of quality performance on road construction project in Jambi Province which generates value of 82,30% and including medium category.

Kata Kunci : SMM, instruksi kerja, importance performance analysis (IPA), structural equation modeling (SEM).

  1. S2-2018-407696-abstract.pdf  
  2. S2-2018-407696-bibliography.pdf  
  3. S2-2018-407696-tableofcontent.pdf  
  4. S2-2018-407696-title.pdf